Risk Distribution
38% Production
24% Finance & Corporate
15% Legal & Regulatory
15% Ability to Sell
6% Macro & Political
3% Tech & Innovation
Finance & Corporate - Financial and accounting risks. Risks related to the execution of corporate activity and strategy
This chart displays the stock's most recent risk distribution according to category. TipRanks has identified 6 major categories: Finance & corporate, legal & regulatory, macro & political, production, tech & innovation, and ability to sell.
Risk Change Over Time
S&P500 Average
Sector Average
Risks removed
Risks added
Risks changed
Orion Group Holdings Risk Factors
New Risk (0)
Risk Changed (0)
Risk Removed (0)
No changes from previous report
The chart shows the number of risks a company has disclosed. You can compare this to the sector average or S&P 500 average.
The quarters shown in the chart are according to the calendar year (January to December). Businesses set their own financial calendar, known as a fiscal year. For example, Walmart ends their financial year at the end of January to accommodate the holiday season.
The quarters shown in the chart are according to the calendar year (January to December). Businesses set their own financial calendar, known as a fiscal year. For example, Walmart ends their financial year at the end of January to accommodate the holiday season.
Risk Highlights Q2, 2026
Main Risk Category
Production
With 13 Risks
Production
With 13 Risks
Number of Disclosed Risks
34
-34
From last reportS&P 500 Average: 31
34
-34
From last reportS&P 500 Average: 31
Recent Changes
0Risks added
0Risks removed
0Risks changed
Since Jun 2026
0Risks added
0Risks removed
0Risks changed
Since Jun 2026
Number of Risk Changed
0
No changes from last report
S&P 500 Average: 1
0
No changes from last report
S&P 500 Average: 1
See the risk highlights of Orion Group Holdings in the last period.
Risk Word Cloud
The most common phrases about risk factors from the most recent report. Larger texts indicate more widely used phrases.
Risk Factors Full Breakdown - Total Risks 34
Production
Total Risks: 13/34 (38%)Above Sector Average
Manufacturing3 | 8.8%
Manufacturing - Risk 1
The businesses of marine infrastructure construction, port maintenance, dredging and salvage are generally subject to a number of risks and hazards, including environmental hazards, industrial accidents, hurricanes, adverse weather conditions, collisions with fixed objects, cave-ins, encountering unusual or unexpected geological formations, disruption of transportation services and flooding. These risks could result in damage to, destruction or loss of, dredges, transportation vessels, other maritime structures and buildings, and could also result in personal injury or death, environmental damage, performance delays, monetary losses or legal liability.Manufacturing - Risk 2
Our business is subject to significant operating risks and hazards that could result in damage or destruction to property, injuries or loss of life, which could result in losses or liabilities to us.Construction and maintenance sites are potentially dangerous workplaces and often put our employees and others in close proximity with mechanized equipment, moving vehicles, or other construction or worksite hazards. On most sites, we are responsible for safety and are contractually obligated to implement safety procedures. Our safety record is an important consideration for us and for our customers. If serious accidents or fatalities occur or our safety record deteriorates, we may be excluded from bidding on certain work, expose ourselves to possible lawsuits, and existing service arrangements could be terminated, thus having a material adverse impact on our financial position, results of operations, cash flows and liquidity. Further, regulatory changes implemented by OSHA or the U.S. Coast Guard could impose additional costs on us. Adverse experience with hazards and claims could have a negative effect on our reputation with our existing or potential new customers and our prospects for future work.
Manufacturing - Risk 3
A significant portion of our revenues may be concentrated among a small number of projects.From time to time in any given period, a significant percentage of our revenues may be attributable to a limited number of contracts, customers or projects. A reduction in scale, a delay in scheduled work, the completion or termination of a material contract, or the loss of a major customer could negatively impact our reputation and could have an adverse effect on our business, our revenue and results of operations. Furthermore, even if the ultimate amount of our contract revenue attributable to a particular project remains the same, delays in scheduled work may impact the timing of the recognition of our contract revenues and profits. In addition, in many cases, we work as a subcontractor or among a team of contractors. Our ability to timely execute on our work is often affected by scheduling changes or contract performance by our co-contractors, all of which are outside of our control.
For example, our Pearl Harbor Project for the United States Navy, our portion of which totals approximately $463.9 million, and our design-build contract for the Grand Bahama Shipyard totaling approximately $125.9 million may concentrate our revenues. To the extent we are unable to perform our services or experience any delays in the Pearl Harbor Project, the Grand Bahama Shipyard or any other significant project, anticipated revenue or profits associated with that project may not be realized or may otherwise shift into future periods, which may impact the accuracy of our guidance. Furthermore, if we are unable to replace projects like the Pearl Harbor Project or the Grand Bahama Shipyard upon completion of those projects, our revenue and profitability may be lower in future years.
Employment / Personnel3 | 8.8%
Employment / Personnel - Risk 1
Our employees in the marine segment are covered by federal laws that provide seagoing employees remedies for job-related claims in addition to those provided by state laws.Employment / Personnel - Risk 2
We may be subject to unionization, work stoppages, slowdowns or increased labor costs.On February 4, 2022, President Biden issued Executive Order 14063, and on December 22, 2023 the Federal Acquisition Regulatory Council issued a final rule (effective January 22, 2024) that generally requires federal agencies, subject to specified exceptions, to include project labor agreement ("PLA") requirements on certain federal construction projects estimated to cost the U.S. Government at least $35 million (and permits agencies, in certain circumstances, to require PLAs below that threshold). Although aspects of the PLA mandate have been challenged in litigation, including a January 21, 2025 decision of the U.S. Court of Federal Claims in a bid protest context, the rule has not been blocked nationwide, and agencies may continue to include PLA requirements in solicitations. If we (or our subcontractors) are required to enter into a PLA on a federal project, we could incur higher labor and compliance costs, face staffing/subcontracting constraints, or experience labor-related disruptions, which could have a material adverse effect on our business, operating results and financial condition.
Only a small percentage of our marine segment workforce, located in the Pacific Northwest and Alaska, is currently unionized. If at any time, a majority of our employees unionized, it could limit the flexibility of the workforce and could result in demands that might increase our operating expenses and adversely affect our profitability. Each of our different employee groups could unionize at any time and would require separate collective bargaining agreements. If any group of our employees were to unionize and we were unable to agree on the terms of their collective bargaining agreement or we were to experience widespread employee dissatisfaction, we could be subject to work slowdowns or stoppages. In addition, we may be subject to disruptions by organized labor groups protesting our non-union status. Any of these events would be disruptive to our operations and could have a material adverse effect on our business, operating results and financial condition.
Employment / Personnel - Risk 3
If we fail to attract, retain and engage appropriately qualified employees, including employees in key positions, our operations and profitability may be harmed. In addition, changes in market compensation rates may adversely affect our profitability.Our performance is highly dependent on attracting, retaining and engaging appropriately qualified employees in our field and corporate offices. Our strategy of offering high-quality services and products for our customers requires a highly trained and engaged workforce. The turnover rate in the specialty construction industry is relatively high, and there is an ongoing need to recruit and train new employees. Factors that affect our ability to maintain sufficient numbers of qualified employees include, for example, employee engagement, our reputation, unemployment rates, competition from other employers, availability of qualified personnel and our ability to offer appropriate compensation and benefit packages. Failure to recruit or retain qualified employees in the future may impair our efficiency and effectiveness and our ability to pursue growth opportunities. In addition, a significant amount of turnover of our executive team or other employees in key positions with specific knowledge relating to us, our operations and our industry may negatively impact our operations.
We operate in a competitive labor market and there is a risk that market increases in compensation and employer-provided benefits could have a material adverse effect on our profitability. We may also be subject to continued market pressure to increase employee hourly wage rates and increased cost pressure on employer-provided benefits. Our need to implement corresponding adjustments within our labor model and compensation and benefit packages could have a material adverse impact to the profitability of our business.
Supply Chain2 | 5.9%
Supply Chain - Risk 1
Our projects could be hindered due to our dependence on third parties to complete many of our contracts.Supply Chain - Risk 2
We may be unable to obtain sufficient bonding capacity for our contracts and the need for performance and surety bonds may adversely affect our business.As more fully described in "Insurance and bonding" under "Item 1. Business," we are generally required to post bonds or other security in connection with government and certain private sector contracts to ensure job completion. We have entered into bonding agreements with several large multinational surety companies, which act as surety, issue bid bonds, performance bonds and payment bonds, and obligate themselves upon other contracts of guaranty required by us in the day-to-day operations of our business. However, our sureties are not obligated under the bonding agreements to issue bonds for us, and bonding decisions are made on a case-by-case basis. We are bidding on increasingly complex, larger jobs for customers who require significant bonds. We may not be able to maintain a sufficient level of bonding capacity in the future which could preclude us from being able to bid for certain contracts and successfully contract with certain customers. In addition, the conditions of the bonding market may change, increasing our costs of bonding or restricting our ability to get new bonding, which could have a material adverse effect on our business, operating results and financial condition.
Costs5 | 14.7%
Costs - Risk 1
Fluctuations in commodity prices or interest rates may affect our customers' investment decisions and therefore subject us to risks of cancellation, delays in existing work, or changes in the timing and funding of new awards. Additionally, fluctuations in commodity prices can negatively affect our project costs.Costs - Risk 2
We may incur higher costs to acquire, manufacture and maintain equipment necessary for our operations.We do not bid on contracts for which we do not have, or cannot quickly procure, whether through construction, acquisition or lease, the necessary equipment to complete projects. We are capable of building much of the specialized equipment used in our projects, including dayboats, tenders and dredges. To the extent that we are unable to buy or build equipment necessary for our needs, either due to a lack of available funding or equipment shortages in the marketplace, we may be forced to rent equipment on a short-term basis, which could increase the costs of completing contracts, thereby reducing contract profitability. In addition, our equipment requires continuous maintenance, which we primarily provide through our own repair facilities, as well as certification by the U.S. Coast Guard for certain marine segment assets. If we are unable to continue to maintain the equipment in our fleet or are unable to obtain the requisite certifications, we may be forced to obtain third-party repair services, be unable to use our uncertified equipment or be unable to bid on contracts, which could have a material adverse effect on our business, operating results and financial condition.
In addition, our vessels in the marine segment may be subject to arrest or seizure by claimants as security for maritime torts committed by the vessel or us, a breach of a fleet mortgage secured by the vessel, or the failure by us to pay for necessities, including fuel and repair services, which were furnished to the vessel. Such arrest or seizure could preclude the vessel from working, thereby causing delays in marine segment projects.
Costs - Risk 3
Our current insurance coverage may not be adequate, and we may not be able to obtain insurance at acceptable rates, or at all.We maintain various insurance policies, including general liability and workers' compensation. We are partially self-insured under some of our policies, and our insurance does not cover all types or amounts of liabilities. We are not required to, and do not, specifically set aside funds for our self-insurance programs.
At any given time, we are subject to multiple workers' compensation and personal injury claims. We maintain substantial loss accruals for workers' compensation claims, and, until recently, our workers' compensation and insurance costs have been rising for several years notwithstanding our emphasis on safety. Our insurance policies may not be adequate to protect us from liabilities that we incur in our business. In addition, some of the projects that we bid on require us to maintain high levels of builder's risk insurance. We may not be able to obtain similar levels of insurance on reasonable terms, or at all. Our inability to obtain such insurance coverage at acceptable rates or at all could have a material adverse effect on our business, operating results and financial condition.
Furthermore, due to a variety of factors such as increases in claims, the rise of "nuclear verdicts" in some of the jurisdictions in which we operate and projected significant increases in medical costs, our insurance premiums may increase in the future and we may not be able to obtain similar levels of insurance on reasonable terms, or at all. Any such inadequacy of, or inability to obtain, insurance coverage at acceptable rates, or at all, could have a material adverse effect on our business, operating results and financial condition.
Insurance liabilities are difficult to assess and quantify due to unknown factors, including the severity of an injury, the determination of our liability in proportion to other parties, the number of incidents not reported and the effectiveness of our safety program. If we were to experience insurance claims or costs above our estimates, we might be required to use working capital to satisfy these costs rather than to maintain or expand our operations. To the extent that we experience a material increase in the frequency or severity of accidents or workers' compensation and health claims, or unfavorable developments on existing claims, our operating results and financial condition could be materially and adversely affected.
Costs - Risk 4
We could suffer contract losses if we fail to accurately estimate our costs or fail to execute within our cost estimates on fixed-price, lump-sum contracts.Much of our revenue is derived from fixed-price, lump-sum contracts. Under these contracts, we perform our services and execute our projects at a fixed price and where, as a result, we could benefit from cost savings, but we may be unable to recover any cost overruns. Fixed-price contracts carry inherent risks, including risks of losses from underestimating costs, operational difficulties and other factors that may occur over the contract period. If our cost estimates for a contract are inaccurate, or if we do not execute the contract within our cost estimates, we may incur losses or the project may not be as profitable as we expected. In addition, we are sometimes required to incur costs in connection with modifications to a contract (change orders) that may not be approved by the customer as to scope and/or price, or to incur unanticipated costs, including costs for customer-caused delays, errors in specifications or designs, or contract suspension or termination that we may not be able to recover. These, in turn, could have a material adverse effect on our business, operating results and financial condition. The revenue, cost and gross profit realized on such contracts can vary, sometimes substantially, from the original projections due to changes in a variety of factors, such as:
- failure to properly estimate costs of engineering, design, material, equipment or labor;- unanticipated technical problems with the structures or services being supplied by us, which may require that we spend our own funds to remedy the problem;- project modifications creating unanticipated costs;- differing site conditions;- changes in the costs of equipment, materials, labor or subcontractors;- our suppliers' or subcontractors' failure to perform;- difficulties in our customers obtaining required governmental permits or approvals;- changes in local laws and regulations;- changes in ad valorem and other tariffs;- delays caused by local weather conditions; and - exacerbation of any one or more of these factors as projects grow in size and complexity.
These risks may increase if the project is of a long-term duration because of the elevated risk that the circumstances that we based our original bid will change in a manner that increases costs. In addition, we sometimes bear the risk of delays caused by unexpected conditions or events.
Costs - Risk 5
The anticipated investment in port and marine infrastructure may not be as large as expected, which may result in periods of low demand for our marine construction services.The demand for port construction, maintenance infrastructure services and dredging may be vulnerable to downturns in the economy generally and in the marine transportation industry specifically. The amount of capital expenditures on port facilities and marine infrastructure in our markets is affected by the actual and anticipated shipping and vessel needs of the economy in general and in our geographic markets in particular. If the general level of economic activity deteriorates, our customers may delay or cancel expansions, upgrades, maintenance and repairs to their infrastructure. A number of other factors, including the financial condition of the shipping industry, could adversely affect our customers and their ability or willingness to fund capital expenditures in the future. During downturns in the U.S. or world economies, the anticipated port usage in our geographic markets may decline, resulting in less port construction, upgrading and maintenance. As a result, demand for our services could substantially decline for extended periods.
Finance & Corporate
Total Risks: 8/34 (24%)Below Sector Average
Accounting & Financial Operations2 | 5.9%
Accounting & Financial Operations - Risk 1
The timing and funding of new contracts may result in volatility in our cash flow and profitability. These factors, as well as others that may cause our actual financial results to vary from any publicly disclosed earnings guidance and forecasts, are outside of our control.Accounting & Financial Operations - Risk 2
We may not be able to fully realize the revenue value reported in our backlog.As of December 31, 2025, we had a backlog of work to be completed on contracts totaling approximately $480 million in our marine segment and approximately $160 million in our concrete segment. Backlog includes new awards, which represent the potential revenue value realizable pursuant to new project commitments received by us during a given period.
Backlog consists of awarded projects that have either (a) not yet been started or (b) are in progress but are not yet complete. In the latter case, the revenue value reported in backlog is the remaining value related to work that has not yet been completed. We cannot guarantee that the revenue projected in our backlog will be realized, or if realized, will result in earnings. From time-to-time, projects are cancelled that appeared to have a high certainty of going forward at the time they were recorded as new awards. In the event of a project cancellation, we may be reimbursed for certain costs but typically have no contractual right to recover the total revenue reflected in our backlog. In addition to being unable to recover certain direct costs, cancelled projects may also result in additional unrecoverable costs due to the resulting under-utilization of our assets or labor force.
Debt & Financing3 | 8.8%
Debt & Financing - Risk 1
Our bonding requirements may limit our ability to incur indebtedness.Debt & Financing - Risk 2
Our variable rate indebtedness subjects us to interest rate risk, which could cause our debt service obligations to increase significantly.Borrowings under the UMB Credit Agreement allow for loans at variable rates of interest and expose us to interest rate risk. If interest rates increase, our debt service obligations on the variable rate indebtedness will increase even though the amount borrowed will remain the same, and our net income and operating cash flows, including cash available for servicing our indebtedness, will correspondingly decrease. Additionally, rising interest rates may increase our cost of capital and, therefore, reduce the amount of capital available to fund our operations.
In the future, we may enter into interest rate swaps and other derivative instruments that involve the exchange of floating for fixed rate interest payments in order to reduce interest rate volatility. However, we may not maintain those instruments with respect to all of our variable rate indebtedness, and any instruments we enter into may not fully mitigate our interest rate risk and subject us to counter-party credit risk.
Debt & Financing - Risk 3
Our indebtedness includes covenants and obligations with regard to our business activities that may restrict our ability to take certain actions which may negatively affect our financial condition.At December 31, 2025, we had no outstanding indebtedness under our five-year $120.0 million senior secured credit facility (the "UMB Credit Agreement"), dated December 23, 2025. We must comply with customary affirmative and negative covenants contained in the UMB Credit Agreement, some of which may restrict the way in which we conduct our business. Among other things, these requirements could potentially limit our ability to:
- incur additional indebtedness or liens;- make payments in respect of or redeem or acquire any debt or equity issued by us;- sell assets;- make loans or investments;- make guarantees;- enter into any hedging agreement for speculative purposes;- acquire or be acquired by other companies; or - amend some of our contracts.
The restrictions under our indebtedness may prevent us from engaging in certain transactions which might otherwise be considered beneficial to us, for example, they could:
- increase our vulnerability to general adverse economic and industry conditions;- limit our ability to fund future working capital and capital expenditures, to engage in future acquisitions, to enter into new construction or development activities, or to otherwise fully realize the value of our assets and opportunities because of the need to dedicate a substantial portion of our cash flow from operations to payments on our indebtedness or to comply with any restrictive terms of our indebtedness;- limit our flexibility in planning for, or reacting to, changes in our businesses and the industries in which we operate; and - place us at a competitive disadvantage as compared to our competitors that have less debt.
We may incur additional indebtedness in the future by issuing debt instruments, under new credit agreements, under joint venture agreements, under capital leases or synthetic leases, on a project-finance or other basis or a combination of these. If we incur additional indebtedness in the future, it likely would be under arrangements that may have terms and conditions at least as restrictive as those contained in our UMB Credit Agreement. At December 31, 2025, available capacity to borrow on the revolving lines of credit was $60.0 million. Failure to comply with the terms and conditions of any existing or future indebtedness, including current or prospective covenants, would constitute an event of default. If an event of default occurs, the lenders will have the right to accelerate the maturity of such indebtedness and foreclose upon the collateral, if any, securing that indebtedness.
Corporate Activity and Growth3 | 8.8%
Corporate Activity and Growth - Risk 1
Our financial performance will be negatively impacted if we are unable to execute our growth strategy.Corporate Activity and Growth - Risk 2
Acquisitions and mergers may disrupt our business, and integrating acquired companies may be more difficult, costly, or time-consuming than we expect.Our growth strategy includes, among other things, acquisitions and vertical integrations. For example, on February 3, 2026, we completed the acquisition of JEM. Our acquisition activities could be material to our business and involve a number of significant risks, including the following:
- incurring time and expense associated with identifying and evaluating potential acquisitions and negotiating potential transactions, resulting in management's attention being diverted from the operation of our existing business;- using inaccurate estimates and judgments to evaluate risks with respect to the target company or the assets we seek to acquire;- intense competition from other potential acquirers, many of which have substantially greater resources than we do;- potential exposure to unknown or contingent liabilities of any target we acquire;- inability to realize the expected revenue increases, cost savings, increases in geographic or service presence, and other projected benefits;- incurring time and expense required to integrate the operations and personnel of the combined businesses;- inconsistencies in standards, procedures, and policies that would adversely affect our ability to maintain relationships with customers and employees;- losing key employees and customers; and - possible future impairment of goodwill and other intangibles resulting from acquisitions.
The economic benefits expected to result from acquisitions might not occur or may be less than we expect. As with any acquisition, there also may be business disruptions that cause us to lose customers. Failure to successfully identify, acquire and integrate businesses could have an adverse effect on our business, operating results and financial condition, and ability to implement our strategy.
Corporate Activity and Growth - Risk 3
We conduct a portion of our operations through joint ventures, exposing us to risks and uncertainties, many of which are outside of our control.We conduct a portion of our operations through project-specific joint ventures, pursuant to which we jointly bid on and execute projects with other companies in the construction industry. For example, we are a joint venture partner to Kraemer North America for the Deschutes Estuary Restoration Project. We may in the future enter into additional joint ventures.
These joint ventures expose us to risks and uncertainties. Success on joint venture projects depends in part on whether our joint venture partners satisfy their obligations, and we cannot control the actions of our joint venture partners. Differences in views among joint venture partners may result in delayed decisions or failures to agree on major issues. If our joint venture partners, or as a result the joint venture, fails to satisfy its obligations, the customer may terminate the project, which could result in legal liability to us, harm to our reputation and reduce our revenues and profit for a project. If our reputation as a joint venture partner is harmed, it may be difficult for us to enter into new joint venture arrangements which are increasingly required due to the increased size and scale of projects we are bidding on and expect to bid on in the future.
We and our joint venture partners are also generally jointly and severally liable for all liabilities and obligations of the joint venture. If our partners do not meet their contractual obligations, the joint venture may be unable to adequately perform and deliver its contracted services, requiring us to make additional investments or perform additional services to the customer. While we attempt to mitigate that risk through indemnification and subcontractor arrangements, we could ultimately be liable for both our obligations and those of our partners, which may result in reduced profits, significant losses on the project and a negative impact to our cash flows.
In some joint ventures and similar arrangements, we may not be the controlling member. In these cases, we may have limited control over the actions of the joint venture. In addition, joint ventures or similar arrangements may not be subject to the same requirements regarding internal controls and internal control over financial reporting that we follow. To the extent the controlling member makes decisions that negatively impact the joint venture or arrangement or internal control problems arise within the joint venture or arrangement, it could have a material adverse impact on our business, results of operations, cash flows or financial condition.
Legal & Regulatory
Total Risks: 5/34 (15%)Below Sector Average
Regulation2 | 5.9%
Regulation - Risk 1
If we fail to comply with immigration laws, such failure could result in significant liabilities, harm our reputation with our customers and disrupt our operations.Regulation - Risk 2
Restrictions on foreign ownership of our vessels could limit our ability to sell off any portion of our marine construction segment or result in the forfeiture of our vessels or in our inability to continue our operations in United States navigable waters.The Foreign Dredge Act of 1906, the Merchant Marine Act of 1920 (the "Jones Act") and the Vessel Documentation Act require vessels engaged in the transport of merchandise or passengers between two points in the United States or dredging in the navigable waters of the United States to be owned and controlled by United States citizens. The United States citizen ownership and control standards require the vessel-owning entity to be at least 75% U.S. citizen-owned, thus restricting foreign ownership interests in the entities that directly or indirectly own the coastwise-qualified vessels we operate. If we were to seek to sell any portion of our marine segment that owns any of these vessels, we may have fewer potential purchasers, since some potential purchasers might be unable or unwilling to satisfy the foreign ownership restrictions described above; additionally, any sales of certain of our larger vessels to foreign buyers would be subject to approval by the U.S. Maritime Administration. As a result, the sales price for that portion of our marine segment may not attain the amount that could be obtained in an unregulated market.
Litigation & Legal Liabilities1 | 2.9%
Litigation & Legal Liabilities - Risk 1
We could suffer penalties on our contracts for late completion.Taxation & Government Incentives1 | 2.9%
Taxation & Government Incentives - Risk 1
Adverse changes in tax laws both in the United States and abroad, changes in tax rates or exposure to additional income tax liabilities could have a material adverse effect on our results of operations.Environmental / Social1 | 2.9%
Environmental / Social - Risk 1
Our operations are subject to environmental laws and regulations that may expose us to significant costs and liabilities.Ability to Sell
Total Risks: 5/34 (15%)Above Sector Average
Competition1 | 2.9%
Competition - Risk 1
We rely on highly competitive and highly regulated government contracts.Demand2 | 5.9%
Demand - Risk 1
Demand for our services may decrease due to economic recession or a reduction of demand in end markets of our customers.Demand - Risk 2
Our concrete segment is geographically concentrated in Texas.Our concrete segment, which accounted for 36.1%, 34.5% and 44.4% of our contract revenues for the years ended December 31, 2025, 2024 and 2023, respectively, is concentrated in the metropolitan areas of the State of Texas, particularly Houston and Dallas. Given this concentration, general economic conditions, regulatory changes, changes in demographics, material costs, labor conditions, competition and other conditions that affect those metropolitan areas or the State of Texas may have a disproportionate impact on the performance of our concrete segment. In addition, our operations in Texas may make us more susceptible to natural disasters, including hurricanes, tornadoes and flooding.
Sales & Marketing2 | 5.9%
Sales & Marketing - Risk 1
We may not be able to enter into contracts associated with our pipeline of opportunities, or realize any revenue associated with our pipeline of opportunities.Sales & Marketing - Risk 2
Our business depends on good customer relationships and our reputation in both the marine and concrete infrastructure markets, which is developed and maintained by our executives and key project managers. Loss of any of our relationships, reputation or executives or key project managers could materially reduce our revenues and profits.Although we have master service agreements with numerous customers that generally define the contractual terms under which we would perform awarded work, contractual commitments are typically entered into on a project-by-project basis, so we generally do not have continuing contractual commitments with our customers beyond the terms of the current contract. We benefit from key customer relationships built over time and with both public and private entities. We also benefit from our reputation in the marine and concrete construction markets developed over years of successfully performing on projects. Both of these aspects of our business were developed and are maintained by our executives and key project managers. Our inability to retain our executives and key project managers or inability to complete projects timely and successfully resulting in customer satisfaction could have a material adverse effect on our current customer relationships and reputation. The inability to maintain relationships with our customers in general or obtain new customers based on our reputation could have a material adverse effect on our business, operating results and financial condition.
Macro & Political
Total Risks: 2/34 (6%)Below Sector Average
International Operations1 | 2.9%
International Operations - Risk 1
Our marine segment operates in jurisdictions outside of the U.S. and we intend to continue expanding our operations to more jurisdictions outside of the U.S.Natural and Human Disruptions1 | 2.9%
Natural and Human Disruptions - Risk 1
Our operations are susceptible to a variety of adverse conditions including weather conditions, natural disasters, health epidemics or pandemics or other contagious outbreaks and terrorist attacks that could negatively impact the markets in which we operate.Tech & Innovation
Total Risks: 1/34 (3%)Below Sector Average
Cyber Security1 | 2.9%
Cyber Security - Risk 1
Systems and information technology interruption or failure and data security breaches could adversely impact our ability to operate or expose us to significant financial losses and reputational harm.See a full breakdown of risk according to category and subcategory. The list starts with the category with the most risk. Click on subcategories to read relevant extracts from the most recent report.
FAQ
What are “Risk Factors”?
Risk factors are any situations or occurrences that could make investing in a company risky.
The Securities and Exchange Commission (SEC) requires that publicly traded companies disclose their most significant risk factors. This is so that potential investors can consider any risks before they make an investment.
They also offer companies protection, as a company can use risk factors as liability protection. This could happen if a company underperforms and investors take legal action as a result.
It is worth noting that smaller companies, that is those with a public float of under $75 million on the last business day, do not have to include risk factors in their 10-K and 10-Q forms, although some may choose to do so.
How do companies disclose their risk factors?
Publicly traded companies initially disclose their risk factors to the SEC through their S-1 filings as part of the IPO process.
Additionally, companies must provide a complete list of risk factors in their Annual Reports (Form 10-K) or (Form 20-F) for “foreign private issuers”.
Quarterly Reports also include a section on risk factors (Form 10-Q) where companies are only required to update any changes since the previous report.
According to the SEC, risk factors should be reported concisely, logically and in “plain English” so investors can understand them.
How can I use TipRanks risk factors in my stock research?
Use the Risk Factors tab to get data about the risk factors of any company in which you are considering investing.
You can easily see the most significant risks a company is facing. Additionally, you can find out which risk factors a company has added, removed or adjusted since its previous disclosure. You can also see how a company’s risk factors compare to others in its sector.
Without reading company reports or participating in conference calls, you would most likely not have access to this sort of information, which is usually not included in press releases or other public announcements.
A simplified analysis of risk factors is unique to TipRanks.
What are all the risk factor categories?
TipRanks has identified 6 major categories of risk factors and a number of subcategories for each. You can see how these categories are broken down in the list below.
1. Financial & Corporate
- Accounting & Financial Operations - risks related to accounting loss, value of intangible assets, financial statements, value of intangible assets, financial reporting, estimates, guidance, company profitability, dividends, fluctuating results.
- Share Price & Shareholder Rights – risks related to things that impact share prices and the rights of shareholders, including analyst ratings, major shareholder activity, trade volatility, liquidity of shares, anti-takeover provisions, international listing, dual listing.
- Debt & Financing – risks related to debt, funding, financing and interest rates, financial investments.
- Corporate Activity and Growth – risks related to restructuring, M&As, joint ventures, execution of corporate strategy, strategic alliances.
2. Legal & Regulatory
- Litigation and Legal Liabilities – risks related to litigation/ lawsuits against the company.
- Regulation – risks related to compliance, GDPR, and new legislation.
- Environmental / Social – risks related to environmental regulation and to data privacy.
- Taxation & Government Incentives – risks related to taxation and changes in government incentives.
3. Production
- Costs – risks related to costs of production including commodity prices, future contracts, inventory.
- Supply Chain – risks related to the company’s suppliers.
- Manufacturing – risks related to the company’s manufacturing process including product quality and product recalls.
- Human Capital – risks related to recruitment, training and retention of key employees, employee relationships & unions labor disputes, pension, and post retirement benefits, medical, health and welfare benefits, employee misconduct, employee litigation.
4. Technology & Innovation
- Innovation / R&D – risks related to innovation and new product development.
- Technology – risks related to the company’s reliance on technology.
- Cyber Security – risks related to securing the company’s digital assets and from cyber attacks.
- Trade Secrets & Patents – risks related to the company’s ability to protect its intellectual property and to infringement claims against the company as well as piracy and unlicensed copying.
5. Ability to Sell
- Demand – risks related to the demand of the company’s goods and services including seasonality, reliance on key customers.
- Competition – risks related to the company’s competition including substitutes.
- Sales & Marketing – risks related to sales, marketing, and distribution channels, pricing, and market penetration.
- Brand & Reputation – risks related to the company’s brand and reputation.
6. Macro & Political
- Economy & Political Environment – risks related to changes in economic and political conditions.
- Natural and Human Disruptions – risks related to catastrophes, floods, storms, terror, earthquakes, coronavirus pandemic/COVID-19.
- International Operations – risks related to the global nature of the company.
- Capital Markets – risks related to exchange rates and trade, cryptocurrency.