Want to see FLY full AI Analyst Report?
Firefly Aerospace, Inc. (FLY) Q2 2026 Earnings Report
FLY Q2 2026 EPS Results
- Actual EPS
- -$0.42
- Consensus EPS
- -$0.51
- Beat/Miss
- Beat by +$0.09
- One Year Ago EPS
- -$5.78
FLY Q2 2026 Revenue Results
- Actual Revenue
- $117.68M
- Expected Revenue
- $88.20M
- Beat/Miss
- Beat by +$29.48M
- YoY Revenue Growth
- +656.85%
Earnings Announcement Details
- Quarter
- Q2 2026
- Date
- 08/11/2026
- Time
- After Close
- Conference Call
- Tuesday, August 11, 2026
Firefly Aerospace, Inc.'s next earnings date is estimated for November 10, 2026, based on past reporting schedules.
Q2 2026 Earnings Call Audio
Q2 2026 Earnings Slide Deck
Q2 2026 Earnings Call Summary
The call presented strong operational and commercial momentum highlighted by record quarterly revenue ($117.7M), a record $1.5B backlog, substantial liquidity (~$940M), multiple high-profile contract wins (NASA lunar missions, MoonFall, SkyFall, Golden Dome, GBRD) and meaningful production and engine test milestones (Miranda engine). Non-GAAP profitability metrics showed quarterly improvement, and strategic acquisitions (Space-ng, SciTec) improved vertical integration. Offsetting these positives were sizable GAAP losses, negative free cash flow (worsened q/q), a slight decline in GAAP gross margin, increased operating and stock-based compensation expenses, share dilution from an equity raise, and execution/timing risks tied to launch schedules and external approvals. Given the combination of accelerating revenue/backlog, cash runway, and technical progress versus ongoing operating losses and near-term cash burn, the overall tone is constructive and growth-oriented but still depends on successful execution of launches and margin expansion.
Firefly reiterated 2026 revenue guidance of $420–$450 million, anchored by Q2 results of $117.7 million (up 46% sequentially and 659% year‑over‑year), with Spacecraft revenue of $108.3M and Launch $9.4M, and a record backlog of ~$1.5 billion (up from $1.3B) and roughly 95% of 2026 revenue booked at the midpoint; Q2 GAAP gross margin was 20.3% (vs 21.6% prior), GAAP operating expenses $119.1M/non‑GAAP $94.3M, GAAP operating loss $95.2M/non‑GAAP operating loss $70.4M, GAAP net loss $92.3M/non‑GAAP net loss $67.7M, GAAP EPS ‑$0.57/non‑GAAP EPS ‑$0.42 (weighted average shares 161.8M, 166.2M outstanding at quarter end, ~167.2M expected in Q3, rising ~1M per quarter); adjusted EBITDA loss was $61.2M, total liquidity stood at $940.3M ($635.3M cash/short‑term investments + $305M revolver), Q2 capex was $24.8M, free cash flow outflow $106.3M (including a ~ $24M SciTec payment), the June equity raise contributed ~$182.6M net, and notable program and contract metrics cited include Elytra MoonFall $75M, JPL SkyFall $13M, GBRD $94M, Space‑ng adding ~15 engineers, a target of three Alpha launches in 2026 with Flight 8 targeting Q4 (Flights 10–11 in production), Miranda engine >150 hot fires including a 226s flight‑like test (MDC 206s), and an inaugural Eclipse launch targeted no earlier than 2027.
- Record Quarterly RevenueSecond quarter revenue of $117.7 million, up 46% sequentially and 659% year-over-year, driven by strong Spacecraft Solutions execution (Spacecraft revenue $108.3M; Launch $9.4M).
- Record Backlog and Strong Contract WinsBacklog reached a record $1.5 billion (up from $1.3B last quarter, ~15% quarter-over-quarter growth) following multiple awards including two additional NASA lunar missions, the $75M MoonFall JPL subcontract, a $13M SkyFall JPL aeroshell award, Lockheed Martin multi-launch extension, Golden Dome prime role, and a $94M SciTec GBRD award from the Space Force.
- Large Liquidity CushionEnded the quarter with $940.3 million total liquidity (approximately $635.3M cash, cash equivalents and short-term investments plus $305M undrawn revolving credit capacity). Cash balance included ~$182.6M net proceeds from a June equity offering.
- Operational and Production Ramp ProgressSignificant production throughput improvements between May and August: increased Alpha mandrel tooling efficiency, higher Reaver engine integration rates, Cortex facility added 55,000 sq ft; Flights 8–11 are in production pipeline enabling higher cadence.
- Eclipse Miranda Engine Test MilestoneMiranda engine surpassed 150 hot-fire tests, including a 226-second flight-like Mission Duty Cycle (exceeding 206-second requirement); engine qualification described as imminent and flight engines in production.
- Progress on Lunar & Interplanetary ProgramsExecuting five lunar missions in parallel; Blue Ghost far-side mission assembly progressed (primary structures passed acceptance), Elytra serving as long-haul comms relay and commercial Ocula imaging host; awarded first Mars contract work (SkyFall aeroshell), extending capabilities beyond lunar missions.
- Improving Non-GAAP Profitability MetricsNon-GAAP operating loss improved to $70.4M from $76.2M (≈7.6% improvement q/q). Non-GAAP net loss improved to $67.7M from $74.0M (≈8.5% improvement q/q). Adjusted EBITDA loss narrowed to $61.2M from $64.7M (≈5.4% improvement).
- Strategic Acquisitions and Vertical IntegrationAcquired Space-ng (AI vision/navigation and autonomous guidance) and integrated SciTec acquisition synergies; Space-ng brings ~15 software engineers and augments autonomous landing/vision capabilities for Blue Ghost and Elytra.
FLY Earnings History
| Report Date | Fiscal Quarter | Forecast / EPS | Last Year's EPS | EPS YoY Change | Press Release |
|---|---|---|---|---|---|
| Nov 10, 2026 | 2026 (Q3) | -0.53- | -1.5 | ― | ― |
| Aug 11, 2026 | 2026 (Q2) | -0.51-0.42 | -5.78 | 92.73% (+5.36) | |
| May 04, 2026 | 2026 (Q1) | -0.52-0.46 | -0.47 | 2.13% (+0.01) | |
| Mar 19, 2026 | 2025 (Q4) | -0.44-0.38 | -0.72 | 46.93% (+0.34) | |
| Nov 12, 2025 | 2025 (Q3) | -0.41-1.50 | -0.32 | -367.29% (-1.18) | |
| Sep 23, 2025 | 2025 (Q2) | -0.43-5.78 | -0.41 | -1313.20% (-5.37) |
The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.

