Want to see BTU full AI Analyst Report?
Tons Sold by Segment
Tracks the volume of coal sold in each segment, reflecting demand levels and market penetration across different regions or product lines.Seaborne metallurgical is the clear trouble spot—volumes stepped down materially when Centurion underperformed, cutting ~1M tons and lifting per‑ton costs so the met segment became an EBITDA drag despite stronger benchmark pricing. PRB and seaborne thermal remain the cash engines, supporting Q1 adjusted EBITDA, but seaborne thermal carries material unpriced exposure and diesel/freight headwinds that threaten Q2 margins. Management expects Centurion to recover in H2 2026, but the postponed longwall move into early‑2027 means metallurgical risk and price exposure persist near term.
Date | Seaborne Thermal Mining | Seaborne Metallurgical Mining | Powder River Basin Mining | Other US Thermal Mining | Corporate & Other |
|---|---|---|---|---|---|
Jun 30, 2026 | 3.00M | 2.50M | 16.40M | 3.00M | 0.00 |
Mar 31, 2026 | 3.00M | 2.00M | 21.20M | 3.30M | 100.00K |
Dec 31, 2025 | 3.30M | 2.50M | 22.30M | 3.70M | 100.00K |
Sep 30, 2025 | 4.10M | 2.10M | 22.60M | 3.70M | 0.00 |
Jun 30, 2025 | 3.60M | 2.20M | 20.00M | 2.90M | 0.00 |
Mar 31, 2025 | 4.40M | 1.80M | 19.60M | 3.10M | 0.00 |
Dec 31, 2024 | 4.20M | 2.20M | 23.00M | 3.70M | 0.00 |
Sep 30, 2024 | 4.10M | 1.70M | 22.10M | 4.00M | 0.00 |
Jun 30, 2024 | 4.10M | 2.00M | 15.80M | 3.70M | 0.00 |
Mar 31, 2024 | 4.00M | 1.40M | 18.70M | 3.20M | 100.00K |