Want to see XE full AI Analyst Report?
X-Energy, Inc. Class A (XE) Q2 2026 Earnings Report
XE Q2 2026 EPS Results
- Actual EPS
- -$0.15
- Consensus EPS
- -$0.10
- Beat/Miss
- Missed by -$0.05
- One Year Ago EPS
- $0.00
XE Q2 2026 Revenue Results
- Actual Revenue
- $54.60M
- Expected Revenue
- $41.65M
- Beat/Miss
- Beat by +$12.95M
- YoY Revenue Growth
- ―
Earnings Announcement Details
- Quarter
- Q2 2026
- Date
- 08/13/2026
- Time
- Before Open
- Conference Call
- Thursday, August 13, 2026
X-Energy, Inc. Class A's next earnings date is estimated for November 12, 2026, based on past reporting schedules.
Q2 2026 Earnings Call Audio
Q2 2026 Earnings Slide Deck
Q2 2026 Earnings Call Summary
The call highlighted substantial progress on strategic de‑risking and commercialization building blocks: a meaningful incremental DOE ARDP allocation, binding HALEU and graphite supply agreements, a major licensing milestone for TRISO‑X, strong revenue growth (+154% YoY) and a strengthened balance sheet with $1.9B in cash & investments and no debt. Offsetting these positives are development-stage economics: operating expenses materially exceed current revenues, significant noncash equity charges, elevated quarterly cash burn ($97.3M), and long multi-year timelines to commercial operations. On balance, the strategic and funding wins along with supply‑chain derisking and robust liquidity outweigh near-term financial drag and timeline risk, producing a constructive outlook.
X‑Energy provided clear near‑term program and financial guidance: TX‑1 vertical construction is ~80% complete and on track for vertical completion and interior build‑out commencement in Q3 2026; NRC staff expected to close safety questions by end‑Aug 2026 with construction permit final review late‑2026 and issuance by Q1 2027; Energy Northwest aims to submit its construction permit in H1 2027; the company expects to announce a next 1 GW project in 2026. Key metrics disclosed: Q2 2026 revenues and grant income $54.6M (services $50.1M, grants $4.5M), up 154% YoY; operating expenses $164.6M (direct $86.7M; SG&A $77.7M, including $33.5M noncash equity compensation); operating cash use $97.3M; capex $63.3M (ARDP reimbursed $23.5M in Q2); cash and investments $1.9B ( $1.1B cash, $490M short‑term, $265M long‑term), and zero debt. Program and supply metrics: DOE ARDP cost share rising toward a total DOE contribution up to $2.115B (including ~ $1.1B prior allocation plus up to $1B incremental), DOE reimbursements to date $547M; secured ~7.6 metric tons HALEU from DOE and binding enrichment agreements with Centrus and General Matter; TRISO‑X pilot first‑pass kernel yield >95%; TX‑1 throughput supports ~11 Xe‑100s, TX‑2 targeted at ~4× TX‑1, and the Tennessee campus aimed to support fuel for ~55 Xe‑100 reactors; SGL investment up to $8M to double medium‑grain graphite capacity by 2030 (billets for up to 8 Xe‑100s/year).
- Significant DOE Funding Increase for ARDPDepartment of Energy notified X-Energy of up to an additional $1.0 billion to the ARDP cooperative agreement, increasing DOE's cost share contribution to the ARDP program up to $2.115 billion (50-50 cost share). This materially strengthens funding for the Dow Seadrift demonstrator and design/fuel efforts.
- Strong Revenue GrowthTotal revenues and grant income for Q2 2026 were $54.6 million, up 154% year-over-year, driven by $50.1 million of services revenue (primarily Xe‑100 design work under ARDP) and $4.5 million of grant income.
- Substantial Liquidity and Strengthened Balance SheetCash and investments totaled $1.9 billion at quarter end (including $1.1 billion cash & equivalents), roughly double the prior quarter following $1.1 billion net IPO proceeds. The company reported zero debt outstanding.
- HALEU and Fuel Supply Agreements De-risk PipelineSecured ~7.6 metric tons of existing HALEU material from DOE and executed long-term HALEU enrichment agreements with Centrus and General Matter with phased firm deliveries; company states these arrangements support initial and replacement core loads of announced Xe‑100 projects, materially reducing HALEU supply risk for the commercial pipeline.
- TRISO‑X Licensing and Fuel Fabrication ProgressReceived NRC Part 70 commercial license for TRISO‑X (initial 40‑year term) — the first new commercial fuel fabrication license in over 50 years. TX‑1 vertical construction ~80% complete with Q3 milestone for vertical completion; TX‑1 is 50-50 cost-shared with DOE and received up to $148 million in federal tax credits; TX campus expanded by 70 acres (total ~180 acres).
- High Manufacturing Process YieldTRISO‑X pilot plant consistently achieved >95% first-pass process yield on kernel conversion, indicating mature process optimization and potential for lower-cost fuel at commercial scale.
- Supply Chain Capacity Agreements for Graphite and Major ComponentsAgreement with SGL Carbon to support expansion of medium-grain graphite capacity (company to invest up to $8 million in milestone-based payments). Work also ongoing to secure large steel NSSS components (Doosan) and steam generator tubes to reduce long-lead item risk.
- Strategic AI Partnerships and Internal UseJoined DOE's Project Prometheus as a founding member (providing $10 million and technical data) and is deploying internal multi-agent AI platform APEX across engineering, licensing and operations to reduce time and cost in design, licensing and manufacturing.
- Project Development Milestones and Pipeline MomentumNRC staff expected to close safety questions by end of August and anticipate construction permit issuance in late 2026 / by Q1 2027 for the Dow project; Energy Northwest moving toward construction permit submission H1 2027; company signals an imminent announcement of a new 1 GW project with a major investor-owned utility.
XE Earnings History
| Report Date | Fiscal Quarter | Forecast / EPS | Last Year's EPS | EPS YoY Change | Press Release |
|---|---|---|---|---|---|
| Nov 12, 2026 | 2026 (Q3) | -0.11- | ― | ― | ― |
| Aug 13, 2026 | 2026 (Q2) | -0.10-0.15 | 0 | ― | |
| Jun 04, 2026 | 2026 (Q1) | -0.13-0.26 | -0.03 | -952.00% (-0.24) |
The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.

