Sigma Lithium earnings date
Sigma Lithium (SGML) Q3 2026 Earnings Report
SGML Q3 2026 EPS Results
- Actual EPS
- -$0.23
- Consensus EPS
- -$0.03
- Beat/Miss
- Missed by -$0.20
- One Year Ago EPS
- -$0.09
SGML Q3 2026 Revenue Results
- Actual Revenue
- $13.20M
- Expected Revenue
- $27.42M
- Beat/Miss
- Missed by -$14.22M
- YoY Revenue Growth
- -51.85%
Earnings Announcement Details
- Quarter
- Q3 2026
- Date
- 11/13/2026
- Time
- Before Open
- Conference Call
- Friday, November 13, 2026
Sigma Lithium's next earnings date is estimated for April 5, 2027, based on past reporting schedules.
Q3 2026 Earnings Call Audio
Q3 2026 Earnings Slide Deck
Q3 2026 Earnings Call Summary
The call was predominantly positive. Management emphasized operational resilience despite an extended third-quarter stoppage, strong margins and cash generation, substantially improved debt maturity, low production costs, safety performance, regulatory support, and a clear path toward 2027 production growth and Phase 2 expansion. The principal negatives were the 7,293-ton third-quarter production level, shutdown-related idle capacity costs, lithium price volatility, delayed overburden removal and plant procurement, limited ASX liquidity, and potential dilution from the convertible debt.
Sigma Lithium is forecasting 240,000 tons for the 12 months forward and 330,000 tons for the full year of 2027, with approximately USD 128 million of cash flow at current lithium prices at 240,000 tons and approximately $191 million at 330,000 tons; it plans to deliver 950 tonnes a day, including approximately 15,000 tons of high-grade material from the reprocessing circuit, and to reach 580,000 tons of capacity through Phase 2. The company plans to start opening Mine 2 “most likely” in the first quarter of next year or later this quarter, resume Plant 2 procurement most likely early in the year of 2027, with approximately USD 80 million left of equipment to be ordered, and expects the second round of fleet upgrades to provide an additional 40% ability to load up the trucks and a 25% increased ability to haul material.
- Resilient Operations Despite Two ShutdownsThe company successfully resumed operations twice during the quarter after demobilizing and remobilizing more than 1,700 people plus equipment. Management described this as a demonstration of operational resilience and execution capability.
- Strong Safety PerformanceSigma maintained 1,190 days with 0 accidents and fatalities. The company also reported a total recordable injury frequency rate (TRIFR) of 0.
- Debt Refinancing and Lower Short-Term DebtSigma issued a 5-year USD 125 million convertible debt instrument at the money. The refinancing lowered short-term debt by 85%, extended debt maturities, and transferred debt maturing in December 2026 to November 2031. Management said Synergy debt will be repaid immediately after the convertible bond closes.
- Robust Margins and Low CostsThird-quarter net revenue margin was 32%, while the nine-month presentation cited a net revenue margin in the 56% to 57% range. CIF cash cost remained at $518 per ton, plant-gate cost was $424 per ton, and all-in sustaining cost was $642 per ton.
- Nine-Month Revenue GrowthNine-month 2026 revenue was $115 million, up 20% from the same period of the prior year, despite the company being stopped for most of the third quarter.
- Positive Cash Flow GenerationThird-quarter operating cash flow was $24 million, and nine-month operating cash flow was $51 million. The company ended the quarter with $10 million of cash and reported a $4 million net cash inflow during the quarter.
- Contracted Sales and Inventory SupportSigma reported approximately $10 million of high-grade sales, unsold low-grade inventory, and outstanding installments on its offtake agreement related to pending high-grade deliveries.
- Projected Cash Flow GrowthAt forecast production of 240,000 tons over the next 12 months, management expects approximately USD 128 million of cash flow at current lithium prices. At forecast 2027 production of 330,000 tons, it expects approximately $191 million of cash flow.
- Improved Leverage and Borrowing CapacityManagement said the refinancing materially reduced leverage and created additional borrowing capacity. At 2027 forecast production levels, the company indicated potential additional borrowing capacity of approximately $170 million at 2x leverage and $330 million at 3x leverage, based on the scenarios presented.
- Production Recovery and 2027 Growth TargetThird-quarter production was 7,000 tons, with 21,000 tons of inventory, and the company reported an additional 11,000 tons of high-grade production entering the fourth quarter. Sigma plans to deliver 240,000 tons over the next 12 months and 330,000 tons in full-year 2027.
- Reprocessing Circuit and Circularity BenefitsThe reprocessing circuit can deliver approximately 15,000 tons of additional high-grade material, upgrades fines through an automated process, and supports 100% circularity. Management said the upgrade increased potential quarterly production from an average of 60,000 tons to 77,000-plus and up to 82,000 tons.
- Mining Fleet UpgradeSigma is deploying larger excavators and trucks. Management said the excavators provide an additional 40% loading capability and the trucks provide a 25% increase in hauling capability, with fewer pieces of equipment and less diesel use.
- Large High-Grade Ore OpportunityThe company is targeting approximately 200,000 tons of concentrate equivalent from approximately 1.1 million tons of ore in the south of the South pit as it removes overburden and accesses additional high-grade material.
- ESG and Regulatory MilestonesSigma said Minas Gerais upheld its licenses and operations, awarded the company a TAC in record time, and classified it as 'too big to stop.' The company also agreed to deliver $1 million of active germination over the next year and said its rock piles meet standards comparable to those of a G7 country.
- Employment and Regional Economic ImpactManagement said more than 19,000 jobs are directly connected to Sigma and that 80,000 people depend on those jobs. Opening a second mine is expected to connect another 25,000 people to Sigma, including 6,400 indirect jobs.
- Phase 2 Expansion PlansSigma plans to begin opening Mine 2 shortly, potentially in the first quarter of next year or later in the current quarter, and plans to resume Plant 2 procurement early in 2027. Management said approximately USD 80 million of equipment remains to be ordered and that Phase 2 would ultimately support 580,000 tons of capacity.
- Strong Realized Pricing and Flexible Offtake StrategyThe company reported a realized price of $1,485 in the previous quarter and said it has achieved realized prices above peers. Sigma has uncommitted material into 2027, is discussing additional offtakes, and is considering a multiyear agreement while retaining the option to continue selling primarily through shorter-term contracts.
- Australian Listing Liquidity PlanManagement said the convertible bonds are convertible into ASX-listed CDIs and that approximately 14% dilution could flow into the ASX market if the bonds convert, potentially beginning after 12 months. The company said this was intended to foster liquidity and trading activity.
SGML Earnings History
| Report Date | Fiscal Quarter | Forecast / EPS | Last Year's EPS | EPS YoY Change | Press Release |
|---|---|---|---|---|---|
| Apr 05, 2027 | 2026 (Q4) | 0.02- | 0.1 | ― | ― |
| Nov 13, 2026 | 2026 (Q3) | -0.03-0.23 | -0.09 | -161.36% (-0.14) | |
| Aug 14, 2026 | 2026 (Q2) | 0.23-0.02 | -0.17 | 88.24% (+0.15) | |
| May 15, 2026 | 2026 (Q1) | 0.140.10 | 0.04 | 150.00% (+0.06) | |
| Mar 30, 2026 | 2025 (Q4) | -0.01-0.23 | -0.07 | -234.78% (-0.16) | |
| Nov 14, 2025 | 2025 (Q3) | -0.07-0.09 | -0.22 | 60.00% (+0.13) | |
| Aug 15, 2025 | 2025 (Q2) | -0.06-0.17 | -0.1 | -70.00% (-0.07) | |
| May 15, 2025 | 2025 (Q1) | ―- | -0.06 | ― | |
| Mar 31, 2025 | 2024 (Q4) | -0.000.04 | -0.06 | 166.67% (+0.10) | |
| Nov 15, 2024 | 2024 (Q3) | 0.05-0.22 | 0.33 | -166.67% (-0.55) |
The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.