Epsilon Energy (EPSN) Q2 2026 Earnings Report

136 Followers

EPSN Q2 2026 EPS Results

Actual EPS
$0.23
Consensus EPS
―
Beat/Miss
―
One Year Ago EPS
$0.21

EPSN Q2 2026 Revenue Results

Actual Revenue
$18.26M
Expected Revenue
―
Beat/Miss
―
YoY Revenue Growth
+57.09%

Earnings Announcement Details

Quarter
Q2 2026
Date
08/12/2026
Time
After Close
Conference Call
Wednesday, August 12, 2026
EPSN Upcoming Earnings

Epsilon Energy's next earnings date is estimated for November 23, 2026, based on past reporting schedules.

Q2 2026 Earnings Call Audio

EPSN Q2 2026 Earnings Call
0:00 / 0:00

Q2 2026 Earnings Slide Deck

No slide deck is available for this earnings event.

Q2 2026 Earnings Call Summary

Q2 2026
Earnings Call Date:Aug 12, 2026|% Change Since:-10.88%|
Earnings Call Sentiment|Positive

The call presents strong operational execution and several near‑term growth catalysts (Powder River Niobrara and Parkman wells, Permian Barnett performance, Woodford appraisal) plus clear cost and balance sheet management. Headwinds are primarily timing and price‑driven: Q2 was a production trough, Marcellus curtailments due to depressed gas prices, and some near‑term capex will not produce results until Q4 or later. Overall, the positives — including guidance, outsized oil volume growth expectations, well outperformance, and cost saves — outweigh the challenges, though execution timing and commodity price sensitivity remain key risks.

Company Guidance

Epsilon for the first time provided second‑half 2026 production guidance and said it expects meaningful quarter‑over‑quarter growth through year‑end, with the midpoint of full‑year 2026 guidance implying high‑teens % year‑over‑year total production growth and almost 200% year‑over‑year oil volume growth; key drivers include 2 Niobrara 2‑mile DUCs (brought online in July and peaking above 900 bbl/d each), a 3‑well Parkman pad (drilled ~1 month early, completions this quarter, initial production expected in Q4) where a recent sell‑down leaves Epsilon with >70% WI, and Permian activity including a 3‑mile Barnett on flowback (early performance in line with type; 2 additional Barnett wells to be drilled H2’26 with completion in Q1’27) plus a Woodford appraisal completion this month; Marcellus volumes are being managed for price with planned curtailments but new wells (5 drilled, 0.4 net; first production in December) are forecast to add ~6.5 MMcf/d net and ~80–90 MMcf/d of midstream throughput initially; capital intensity ramps (well over half of full‑year capex won’t contribute until Q4 and >1/3 of spend shows up in 2027), a 1.0 million‑barrel water impoundment in Converse County, cost saves from replacing 16 compressors (~$65k/month to date, >$100k/month by year‑end), H1 debt paydown of $10M, planned revolver use, a 1.5x EBITDA leverage target, and a hedging policy of ~50% PDP coverage over the next 18 months round out the guidance framework.

  • Guidance Provided for H2 2026 and Anticipated Production GrowthCompany provided production guidance for the second half of 2026 for the first time and expects meaningful quarter‑over‑quarter production growth through the remainder of 2026 driven primarily by crude volumes in the Powder River Basin.
  • Full‑Year 2026 Production Growth OutlookMidpoint of full‑year 2026 guidance indicates 'high teens' year‑over‑year growth in total production and nearly 200% year‑over‑year growth in oil volumes (described as 'almost 200%').
  • Powder River Basin OutperformanceTwo Niobrara DUC completions flowed back and are performing above type curve expectations with peak daily rates in excess of 900 barrels of oil per day from each well; 3‑well Parkman pad drilled ~1 month ahead of plan and expected to begin production in Q4.
  • Permian Barnett MilestoneFirst 3‑mile Barnett lateral placed on flowback in June and is performing in line with or exceeding pre‑drill type curve; earlier wells on acreage show excellent productivity and operator plans two additional Barnett wells to be drilled in H2 2026.
  • Potential Inventory Expansion (Woodford)Woodford appraisal well has been drilled and completion is scheduled; a successful result could meaningfully expand future drilling inventory beyond current Barnett development.
  • Integration of Peak Acquisition Successfully ProgressedTransition period largely completed for Peak acquisition; integration of personnel, systems, and field operations progressed well enabling focus on execution.
  • Capital Program and Facilities Progress1 million barrel lined water supply/impoundment facility procurement progressing with contractor bids under evaluation and construction expected to begin in Q3; design modified to allow produced water recycling to reduce future water sourcing/processing costs.
  • Operational Cost Savings DeliveredCompression program replaced 16 units to date, realizing $65,000 per month in operating expense savings so far, with total monthly savings expected to exceed $100,000 by year end; no declines to existing production from downsizing program.
  • Balance Sheet Actions and Hedging DisciplinePaid down $10 million of debt in H1 2026; targeting 50% PDP hedging over next 18 months (gas via collars) and beginning to add crude hedges for incremental oil volumes; target leverage 1.5x EBITDA and willing to use revolver to fund near‑term ramp.

EPSN Earnings History

EPSN earnings history
Report DateFiscal QuarterForecast / EPSLast Year's EPSEPS YoY ChangePress Release
Nov 23, 20262026 (Q3)―-0.09――
Aug 12, 20262026 (Q2)―0.230.2112.50% (+0.03)
May 13, 20262026 (Q1)―0.020.2-87.88% (-0.17)
Mar 24, 20262025 (Q4)―0.430.05760.00% (+0.38)
Nov 05, 20252025 (Q3)0.030.090.02350.00% (+0.07)
Aug 13, 20252025 (Q2)0.080.210.04420.00% (+0.17)
May 14, 20252025 (Q1)0.140.200.07191.18% (+0.13)
Mar 19, 20252024 (Q4)0.050.050.12-57.26% (-0.07)
Nov 06, 20242024 (Q3)0.040.020.0211.11% (+0.00)
Aug 13, 20242024 (Q2)―0.040.02110.53% (+0.02)

The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.

Beat Missed