TipRanks
Go Ultimate55% OFF

Rainbow Rare Earths (RR1) Q2 2026 Earnings Report

DE:RR1 Q2 2026 EPS Results

Actual EPS
-EUR 0.01
Consensus EPS
―
Beat/Miss
―
One Year Ago EPS
EUR 0.00

DE:RR1 Q2 2026 Revenue Results

Actual Revenue
EUR 0
Expected Revenue
―
Beat/Miss
―
YoY Revenue Growth
―

Earnings Announcement Details

Quarter
Q2 2026
Date
03/31/2026
Time
Before Open
Conference Call
Tuesday, March 31, 2026
DE:RR1 Upcoming Earnings

Rainbow Rare Earths's next earnings date is estimated for March 24, 2027, based on past reporting schedules.

Q2 2026 Earnings Call Audio

No earnings call audio is available for this earnings event.

Q2 2026 Earnings Slide Deck

No slide deck is available for this earnings event.

Q2 2026 Earnings Call Summary

Q2 2026
Earnings Call Date:Mar 31, 2026|% Change Since:-0.86%|
Earnings Call Sentiment|Positive

The call presents multiple strong positives: attractive project economics (high EBITDA, high IRR, low CapEx), successful pilot results and process optimizations, solid strategic partnerships (DFC, Mosaic, TechMet, Traxys), recent capital raise and clear ESG benefits from recovering rare earths from phosphogypsum. Key negatives are a ~1-year schedule delay caused by a failed external technology partner and the subsequent pivot, dependence on project financing and commodity price sensitivity. On balance the highlights are substantial and materially outweigh the lowlights, with management portraying a de-risked, lower-cost pathway to production backed by pilot data and strategic partners.

Company Guidance

Management guidance summarized: management expects to complete the Phalaborwa DFS by end‑2026, target FID end Q3 2027, start construction in 2028 and first production late‑2028/early‑2029 (Uberaba targeted for 2030); published project metrics use a 10% discount (DFC agreed 9.5%), with Phalaborwa CapEx ~USD 320M, 16‑year life and ~USD 181M EBITDA pa (NdPr benchmark $110/kg; spot hit $140/kg earlier), and Uberaba CapEx ~USD 280M, >30‑year life, ~USD 217M EBITDA pa, NPV ~USD 1bn and IRR >45% (EBITDA margins >70%); resource grades ~4,400 ppm TREO (Phalaborwa) and ~5,100 ppm TREO (Uberaba), stacked gypsum volumes ~35Mt ×2 (Phalaborwa) and >85Mt (Brazil) with ~4.5Mtpa gypsum production in Brazil; pilot plant is continuous (24/7) producing ~1 kg/day mixed rare earth hydroxide >75% TREO, pilot PLS flow reduced from ~340 to 40–50 m3/h after CIX and to ~3–4 m3/h into SX, leach stages cut from 3→2 and resin contact time from 32h→8h, conservative resin replacement assumed every 5 years; financing update: raised USD 14.6M at 20p (90% US), current cash burn ~USD 400k/month (~35 months runway), plan project finance ~2/3 debt : 1/3 equity, Rainbow to issue 38M shares to buy remaining 15% Phalaborwa and holds 49% of Uberaba (Mosaic 51%); payability assumptions: MREC ~65–70% (high‑grade ~70%), separated NdPr ~100% payability (≈75% of basket under Chinese pricing).

  • Strong Project Economics — PhalaborwaPhalaborwa projected to generate ~$181M EBITDA per annum (based on Dec 2024 spot NdPr at $110/kg) with ~16-year life, low CapEx of ~US$320M, and very high margins; management notes NdPr traded at ~$140/kg earlier in 2026 (~27% above the $110/kg used in the model), implying upside to EBITDA.
  • Robust Economics — Uberaba (Brazil)Uberaba economic assessment (published recently) shows NPV (10%) ~US$1B, IRR >45%, ~US$217M EBITDA per annum, EBITDA margin >70%, CapEx ~US$280M and >30-year project life; ore grade ~5,100 ppm TREO (vs Phalaborwa ~4,400 ppm).
  • Low Capital Intensity and High MarginsBoth projects are positioned as low CapEx, high-margin rare earth producers (company cites Argus Media ranking as highest-margin rare earth project in development at 2024 pricing) and management expects to be among the lowest cost separated rare earth producers in the West, possibly below Chinese costs.
  • Pilot Plant and Process Development SuccessLarge-scale continuous pilot at Mintek/South Africa running 24/7 produces ~1 kg/day of mixed rare earth hydroxide (commercial-scale intermediate rather than grams typical for pilots); continuous ion exchange (CIX) stage successfully reduces downstream volumetric flows from ~340 m3/h to ~40–50 m3/h and final feed to SX ~3–4 m3/h.
  • Operational Efficiencies and Technical ImprovementsFront-end optimizations reduced leach stages from three to two and by increasing leach temperature cut resin residence time from 32 hours to 8 hours (75% reduction), lowering tankage, steel and earthworks and helping contain CapEx within published ranges.
  • Strategic Partnerships, Funding and SupportSupport from U.S. Development Finance Corporation (DFC) with commitment of US$50M project equity at FID, strategic partner Mosaic for Uberaba (Rainbow holds 49% with no cash outlay for IP contribution), supportive investor TechMet and new investor Traxys; recent capital raise of US$14.6M at 20p, ~90% from U.S. investors.
  • Financial Runway and Cost DisciplineCurrent cash burn ~US$400k/month, the US$14.6M raise provides ~35 months of runway at current burn; management expects DFS completion by end-2026 and estimates remaining DFS/EIA/permitting costs for Phalaborwa at ~US$4–4.5M.
  • Environmental and ESG AdvantagesProjects recover rare earths from phosphogypsum waste (brownfield sites, no displacement of communities, stack remediation and lined stack reclamation planned), offering environmental cleanup value and lower conventional mining/environmental footprint.

DE:RR1 Earnings History

DE:RR1 earnings history
Report DateFiscal QuarterForecast / EPSLast Year's EPSEPS YoY ChangePress Release
Mar 24, 20272027 (Q2)―--0.01――
Oct 28, 20262026 (Q4)―-0.000-100.00% (-0.00)
Mar 31, 20262026 (Q2)―-0.010-200.00% (-0.01)
Oct 27, 20252025 (Q4)―-0.00066.67% (+0.00)
Mar 19, 20252025 (Q2)―-0.000-50.00% (-0.00)
Oct 18, 20242024 (Q4)0.00-0.00-0.0281.25% (+0.02)
Mar 28, 20242024 (Q2)―-0.00033.33% (+0.00)
Oct 30, 20232023 (Q4)―-0.020-433.33% (-0.02)
Mar 31, 20232023 (Q2)―-0.00025.00% (+0.00)
Oct 24, 20222022 (Q4)―-0.0000.00% (+0.00)

The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.

Beat Missed
Show More