Orezone Gold earnings date
Orezone Gold (OEX) Q3 2026 Earnings Report
DE:OEX Q3 2026 EPS Results
- Actual EPS
- EUR 0.04
- Consensus EPS
- EUR 0.06
- Beat/Miss
- Missed by -EUR 0.02
- One Year Ago EPS
- EUR 0.01
DE:OEX Q3 2026 Revenue Results
- Actual Revenue
- EUR 213.10M
- Expected Revenue
- EUR 222.64M
- Beat/Miss
- Missed by -EUR 9.54M
- YoY Revenue Growth
- +251.68%
Earnings Announcement Details
- Quarter
- Q3 2026
- Date
- 11/16/2026
- Time
- After Close
- Conference Call
- Monday, November 16, 2026
Orezone Gold's next earnings date is estimated for March 19, 2027, based on past reporting schedules.
Q3 2026 Earnings Call Audio
No earnings call audio is available for this earnings event.
Q3 2026 Earnings Slide Deck
Q3 2026 Earnings Call Summary
The call was strongly positive overall. Management highlighted record quarterly production, strong EBITDA and net income, balance-sheet deleveraging, maintained consolidated guidance, improving operations at both mines, an attractive Casa Berardi life-of-mine plan and encouraging exploration results. The main challenges were Casa Berardi's quarter-over-quarter production decline and wildfire-related shutdown, Bomboré's expected production and cost positioning within less favorable halves of guidance, higher depreciation, the delayed Heva-Hosco PEA and the pending Stage 2B investment decision.
Orezone said 2026 consolidated gold production guidance remains unchanged at 222,000 to 247,000 ounces, with all-in sustaining costs expected to be between $2,200 and $2,400 per ounce; Bomboré is expected to achieve full year production within the lower half of its guidance range and all-in sustaining costs within the upper half, while Casa Berardi is expected to achieve the midpoint of its guidance range with costs projected towards the lower end of the range. Production is weighted towards the second half of 2026, particularly in Q4, with Q4 production expected to be highest in the year at both operations; Bomboré throughput is expected to be around now about 2.8 to 3 and above nameplate, which was 2.5, while Casa Berardi development is expected to average 22 to 23 next year to meet the plan. Orezone expects to release the Heva-Hosco preliminary economic assessment during the fourth quarter, based on a 3 million tonne per annum plant, and expects approximately 100,000 meters of exploration drilling at Casa Berardi in 2027, with an updated Bomboré life-of-mine plan during the first quarter of 2027 incorporating an additional 100,000 meters of drilling; the company also said Casa Berardi could be pushing towards 150,000 ounces a year, Bomboré could reach 230,000 to 250,000 if and when Stage 2B proceeds, Heva-Hosco would add in the region of 110,000 ounces a year, and there is a clear path to 500,000 ounces, really not 300,000 ounces, with 300,000 ounces the short-term goal.
- Record Gold Production and Strong Financial ResultsOrezone produced a record 59,674 ounces of gold in Q3, bringing year-to-date production to 157,029 ounces. The company generated approximately $112 million in adjusted EBITDA and reported net income of $28 million. Consolidated all-in sustaining costs were $2,475 per ounce for the quarter and $2,409 per ounce year to date.
- Strengthened Balance Sheet and DeleveragingOrezone ended the quarter with approximately $147 million in cash and bullion. Cash increased to $116 million while senior bank debt declined to $56 million at quarter end, continuing the company's deleveraging.
- Strong Realized Gold Pricing and Consecutive Mine EarningsGold sales benefited from record production of over 59,000 ounces and a realized gold price slightly under $4,200 per ounce. Q3 was another consecutive quarter of mine earnings, free cash flow and net income.
- Bomboré Production Trend and Stage 2A CompletionBomboré produced 40,562 ounces in Q3 at an all-in sustaining cost of $2,246 per ounce sold, with production continuing to trend higher. Construction and commissioning of the Stage 2A hard rock expansion were completed yet again under budget. The Stage 5 tailings storage facility lift was completed, and Stage 6 is advancing ahead of schedule.
- Casa Berardi Remained on Target Despite Operational DisruptionsAlthough Casa Berardi production was lower than the previous quarter, the operation exceeded planned throughput and recoveries, allowing production to remain on target. Full-year production is expected to reach the midpoint of guidance, with costs projected toward the lower end of the range.
- 2026 Production and Cost Guidance MaintainedThe company remains on track to achieve its 2026 production and cost guidance. Consolidated gold production guidance remains 222,000 to 247,000 ounces, with all-in sustaining costs expected to be between $2,200 and $2,400 per ounce. Bomboré is expected to produce within the lower half of its guidance range, with costs in the upper half, while Casa Berardi is expected to reach the midpoint of its production range with costs toward the lower end.
- Improved Access to Higher-Grade Material Supports Strong FinishManagement stated that production is weighted toward the second half of 2026, particularly Q4. Improved access to higher-grade material is expected at both operations, and Q4 production is expected to be the highest of the year at both Bomboré and Casa Berardi.
- Casa Berardi Life-of-Mine Plan Establishes Long-Term FoundationThe updated Casa Berardi life-of-mine plan outlines a 14-year mine life, approximately 1.63 million ounces of total gold production, average annual production of approximately 116,000 ounces and life-of-mine all-in sustaining costs of just under $1,900 per ounce. The plan includes restarting higher-grade underground mining and an after-tax net present value of approximately $1.05 billion using a 5% discount rate under base case consensus gold price assumptions.
- Casa Berardi Operational Improvement and Development RatesCasa Berardi underground development rates increased from approximately 5 meters per day when Orezone took over the mine to more than 16 meters per day, with a record of over 26 meters per day during the week referenced on the call. Management expects an average of 22 to 23 meters per day next year to meet the plan and said the operation is well on track.
- Casa Berardi Upside Opportunities IdentifiedManagement identified higher mill throughput, improved grade control and increased gold recoveries as opportunities to increase production above the life-of-mine plan while reducing unit costs. Resource expansion and new discoveries could add higher-grade ounces, strengthen the production profile and extend mine life.
- Encouraging Bomboré Exploration ResultsBomboré exploration is targeting deeper mineralization beneath existing pits, higher-grade subzones and near-surface mineralization along strike. Q3 results included 2.97 grams per tonne over 34 meters, including 4.5 grams over 7 meters; 4.28 grams per tonne over 11 meters; and 8.34 grams per tonne over 6 meters.
- Encouraging Casa Berardi Exploration ResultsCasa Berardi drilling is targeting down-plunge extensions, new zones including the 118 North area and resource conversion ahead of mining. Results included 6.47 grams per tonne over 21.5 meters, including 8.94 grams per tonne over 12.7 meters.
- Continued Investment in Exploration and Resource GrowthExploration remains a key component of the company's strategy, with 12 rigs currently operating across both properties. Orezone is budgeting approximately 100,000 meters of exploration drilling at Casa Berardi in 2027 and expects the updated Bomboré life-of-mine plan in the first quarter of 2027 to incorporate an additional 100,000 meters of drilling.
- Bomboré Throughput Potential Above NameplateFollowing commissioning of the Stage 2A thickener, oxygen plant and rock breaker, Bomboré is currently processing approximately 2.8 to 3 million tonnes per annum. Management expects throughput to be above the 2.5 million tonne per annum nameplate capacity, subject to the characteristics of the different rock types.
- Pathway Toward Higher ProductionManagement described a potential path to more than 300,000 ounces of annual production, including a goal of approximately 150,000 ounces per year at Casa Berardi, more than 200,000 ounces at Bomboré if Stage 2B proceeds, and approximately 110,000 ounces per year from Heva-Hosco. Management stated that the combined opportunity could provide a clear path to 500,000 ounces, although 300,000 ounces is the short-term goal.
- Heva-Hosco Development FrameworkHeva-Hosco is being evaluated as a 3 million tonne per annum open-pit plant, consistent with the 2012 feasibility study but updated for current costs and with a potential change to the construction schedule. Management expects to proceed to a feasibility study after the PEA, potentially complete it in early 2028, make a Board investment decision by mid-2028 and then enter permitting, with a stated minimum timeline of 2.5 to 3 years.
- Gold Sales and Cash Repatriation Continued UninterruptedFollowing the opening of Burkina Faso's new in-country refinery, Orezone said it is working to finalize the refining contract and logistics. In the interim, gold continues to be shipped and sold as scheduled, with proceeds repatriated back into the country without interruption.
DE:OEX Earnings History
| Report Date | Fiscal Quarter | Forecast / EPS | Last Year's EPS | EPS YoY Change | Press Release |
|---|---|---|---|---|---|
| Mar 19, 2027 | 2026 (Q4) | 0.11- | 0.05 | ― | ― |
| Nov 16, 2026 | 2026 (Q3) | 0.060.04 | 0.01 | 300.00% (+0.03) | |
| Aug 12, 2026 | 2026 (Q2) | 0.090.07 | 0.04 | 100.00% (+0.04) | |
| May 13, 2026 | 2026 (Q1) | 0.060.06 | 0.03 | 141.38% (+0.04) | |
| Mar 25, 2026 | 2025 (Q4) | 0.040.05 | 0.05 | -16.67% (-0.01) | |
| Nov 12, 2025 | 2025 (Q3) | 0.030.01 | 0.02 | -50.00% (-0.01) | |
| Aug 13, 2025 | 2025 (Q2) | 0.040.04 | 0.01 | 300.00% (+0.03) | |
| May 14, 2025 | 2025 (Q1) | 0.040.03 | 0.02 | 45.00% (+0.01) | |
| Mar 20, 2025 | 2024 (Q4) | 0.050.05 | 0.04 | 50.00% (+0.02) | |
| Nov 06, 2024 | 2024 (Q3) | 0.030.02 | 0.01 | 100.00% (+0.01) |
The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.

