Ero Copper earnings date
Ero Copper (E0B) Q3 2026 Earnings Report
DE:E0B Q3 2026 EPS Results
- Actual EPS
- EUR 1.09
- Consensus EPS
- EUR 0.91
- Beat/Miss
- Beat by +EUR 0.18
- One Year Ago EPS
- EUR 0.24
DE:E0B Q3 2026 Revenue Results
- Actual Revenue
- EUR 307.45M
- Expected Revenue
- EUR 307.02M
- Beat/Miss
- Beat by +EUR 431.31K
- YoY Revenue Growth
- +99.78%
Earnings Announcement Details
- Quarter
- Q3 2026
- Date
- 11/02/2026
- Time
- After Close
- Conference Call
- Monday, November 2, 2026
Ero Copper's next earnings date is estimated for March 11, 2027, based on past reporting schedules.
Q3 2026 Earnings Call Audio
Q3 2026 Earnings Slide Deck
Q3 2026 Earnings Call Summary
The call was strongly positive, led by record quarterly and year-to-date financial results, rapid debt reduction, improved liquidity, solid copper operating performance, record Xavantina gold output including concentrate sales, and progress on the Furnas growth project. The company also cited effective foreign exchange hedging and cost-saving initiatives. Offsetting issues included inflation and currency-related reported cost pressure, higher Caraíba costs, temporary Tucumã recovery impacts, below-expectation Xavantina mine performance, limited visibility on future concentrate grades and volumes, and temporarily elevated corporate G&A from the SAP implementation. Overall, the highlights significantly outweighed the lowlights.
Arrow Copper expects Q4 to be the strongest operating quarter of the year and remains on track to achieve full year copper production guidance, with C1 cash costs expected to decline sequentially at Caraíba and Tucumã; it expects combined 75 thousand to 80 thousand ounces of gold from Xavantina this year, with 15 thousand oz of concentrate sales assayed and available today, and Q4 mine and plant volumes triangulating into the 20 thousand- to 25 thousand- ton a month range versus a normalized value of about 19 thousand/month. The three new Tucumã filters remain on schedule for completion by year end, with the operation expected to exit 2026 at 4 million per annum, which is where it expects to be for 2027; Caraíba’s 4.5 to 4.7 million ton per annum sustained throughput is considered sustainable, notwithstanding planned shutdowns. The Caraíba shaft is expected to be completed in Q1, with about 300 meters to go and $70 million to go in CapEx, while Furnas’ pre feasibility study is expected in 2027, by September at the latest, and an updated Tucumã resource and reserve estimate is expected before year end.
- Record Quarterly Financial PerformanceThird-quarter revenue was $348 million, up 22% quarter over quarter, supported by copper and gold sales volumes that increased 10% and 47%, respectively, along with strong metal prices. Cash flow from operations reached a record $191 million and adjusted EBITDA reached a record $201 million, with both measures up 39% sequentially.
- Strong Year-to-Date Financial GrowthYear-to-date cash flow from operations exceeded $420 million, up approximately 60% from the same period last year, while adjusted EBITDA reached $470 million, up approximately 110%.
- Accelerated Debt Reduction and Lower LeverageArrow Copper applied $0.97 of every available dollar toward debt reduction this year. It repaid $70 million on its revolving credit facility during the quarter and $105 million year to date. Net debt declined by approximately $99 million in Q3 to approximately $353 million, reducing net debt leverage to approximately 0.5x from a peak of 2.6x at the start of 2025. This was the company's seventh consecutive quarter of accelerated deleveraging.
- Improved Liquidity PositionLiquidity increased by $82 million during the quarter to $264 million, including $114 million in cash and cash equivalents and $150 million of availability under the revolver. Management expects the revolver to be repaid during Q4 under the current price environment.
- Copper Production on TrackConsolidated copper production was 18.3 thousand tonnes in Q3 at a C1 cash cost of just over $2.50 per pound. Throughput at Caraíba and Tucumã increased 8% and 14%, respectively, quarter over quarter. Both operations are expected to achieve record annual throughput volumes, and the company remains on track to achieve full-year copper production guidance.
- Caraíba Production Growth and Sustainable ThroughputCaraíba produced 9.39 thousand tonnes of copper, up 12% from the previous quarter, driven by higher plant throughput, grades and recoveries. Q4 production is expected to benefit from higher mined and processed grades from deeper, high-grade Surubim benches and contributions from the Pilar underground mine. Management said the operation's approximately 4.5 million to 4.7 million tonnes per annum throughput range is sustainable, excluding normal maintenance downtime.
- Tucumã Throughput and Expansion ProgressTucumã produced 8.96 thousand tonnes of copper at a C1 cash cost of $2.12 per pound. Plant throughput increased 14% quarter over quarter, and management expects higher throughput and improved metallurgical recoveries in Q4. The three new filters were delivered to site in late Q3 and remain on schedule for installation and commissioning before year end. Management expects to exit 2026 at a 4 million-tonne-per-annum rate, consistent with the 2027 plan.
- Record Xavantina Gold Output Including ConcentratesTotal gold produced and recovered at Xavantina increased 23% quarter over quarter to approximately 25 thousand ounces, a quarterly record. Gold recovered from historic stockpiles increased 47% to 17.4 thousand ounces at C1 cash costs of $621 per ounce. Based on available assays and in-process material, management expects combined Xavantina production of 75 thousand to 80 thousand ounces this year, which would be a company record.
- Gold Concentrate Infrastructure Delivering ResultsInvestments in drying capacity for historic concentrates, including the mobile filter press and induced dry air commissioned at the end of Q2, supported increased concentrate throughput. Management said the program provides operational and commercial flexibility, with approximately 15 thousand ounces assayed and available for Q4 sales, including more than 6 thousand ounces invoiced in October.
- Foreign Exchange Hedging Protected Cash MarginsThe foreign exchange hedge program generated $10 million of realized gains in Q3 and $30 million through the first nine months. Management said the hedge strategy worked as intended alongside the 1 Arrow cost-savings initiative to offset inflationary pressures. Applying the year-to-date gains to operations on a pro rata basis would reduce consolidated copper C1 cash costs by $0.15 per pound and Xavantina C1 cash costs by $50 per ounce over the full year.
- Furnas Exploration Milestone Completed Ahead of ScheduleArrow Copper completed the 45 thousand-metre Phase III drill program at Furnas in August, completing the exploration component of the earning agreement with Vale Base Metals more than two years ahead of schedule. Drilling has consistently demonstrated high-grade continuity within deposit extensions at depth and along strike, and full Phase III results are expected before year end.
- Furnas Technical Work and Permitting AdvancingThe company is advancing technical work to support the Furnas pre-feasibility study, which is expected in 2027 and no later than September under the milestone agreement. Permitting activities are also progressing in parallel.
- Caraíba Shaft Project ProgressingApproximately 1.25 thousand metres of the Caraíba shaft had been completed, leaving about 300 metres remaining. Management continues to expect completion in Q1. The project had incurred approximately $370 million of investment by the end of Q3, with approximately $70 million remaining to be spent.
- Potential Shareholder Return Framework Under ReviewManagement said it is below its targeted leverage ratio, is on track to repay the revolver, and has held active discussions with the board regarding a shareholder return framework. The company will announce the framework when it is ready.
- Upcoming Tucumã Technical ReportAn updated Tucumã technical report, including an updated resource and reserve estimate and information about reserve construction and phases, is expected before year end.
DE:E0B Earnings History
| Report Date | Fiscal Quarter | Forecast / EPS | Last Year's EPS | EPS YoY Change | Press Release |
|---|---|---|---|---|---|
| Mar 11, 2027 | 2026 (Q4) | 1.11- | 0.93 | ― | ― |
| Nov 02, 2026 | 2026 (Q3) | 0.911.09 | 0.24 | 351.85% (+0.85) | |
| Aug 05, 2026 | 2026 (Q2) | 0.660.74 | 0.41 | 80.43% (+0.33) | |
| May 04, 2026 | 2026 (Q1) | 0.530.62 | 0.31 | 97.14% (+0.30) | |
| Mar 05, 2026 | 2025 (Q4) | 0.920.93 | 0.15 | 511.76% (+0.78) | |
| Nov 04, 2025 | 2025 (Q3) | 0.290.24 | 0.24 | 0.00% (+0.00) | |
| Jul 31, 2025 | 2025 (Q2) | 0.280.41 | 0.16 | 155.56% (+0.25) | |
| May 05, 2025 | 2025 (Q1) | 0.190.31 | 0.14 | 118.75% (+0.17) | |
| Mar 06, 2025 | 2024 (Q4) | 0.180.15 | 0.19 | -19.05% (-0.04) | |
| Nov 05, 2024 | 2024 (Q3) | 0.230.24 | 0.16 | 50.00% (+0.08) |
The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.


