- Actual EPS
- -EUR 0.03
- Consensus EPS
- EUR 0.00
- Beat/Miss
- Missed by -EUR 0.03
- One Year Ago EPS
- -EUR 0.03
DE:8YD Q3 2026 Revenue Results
- Actual Revenue
- EUR 17.45M
- Expected Revenue
- EUR 19.30M
- Beat/Miss
- Missed by -EUR 1.86M
- YoY Revenue Growth
- +68.54%
Earnings Announcement Details
- Quarter
- Q3 2026
- Date
- 11/11/2026
- Time
- After Close
- Conference Call
- Wednesday, November 11, 2026
Magna Mining's next earnings date is estimated for April 26, 2027, based on past reporting schedules.
Q3 2026 Earnings Call Audio
No earnings call audio is available for this earnings event.
Q3 2026 Earnings Slide Deck
No slide deck is available for this earnings event.
Q3 2026 Earnings Call Summary
The call was predominantly positive. Magna reported a record quarterly copper-equivalent grade, an 81% reduction in the total recordable injury frequency rate, strong nine-month cash margin generation, a substantially higher cash balance following Alpayana's $140 million strategic investment, positive Levack and Crean Hill technical studies, and Board approval for both the Levack restart and Crean Hill construction. These developments were partly offset by McCreedy West operational challenges, deferred higher-grade production, revised 2026 production guidance of 14.5 million to 15.5 million copper-equivalent pounds, negative Q3 free cash flow, and the $7 million reduction in Q3 net revenue from the precious-metals stream. Overall, the highlights significantly outweighed the lowlights.
Magna now expects to produce 14.5 million to 15.5 million copper equivalent pounds in 2026, with its full year copper equivalent grade anticipated to be near the lower end of the original range of 3.2% to 3.5%; Levack’s production hoist recommissioning project remains on track to be completed in Q1 of 2027, with first production ore anticipated starting in Q2 and commercial production forecast for mid-2028, based on average annual production of 36.8 million pounds payable copper equivalent over a 7.3-year mine life, a mining rate of 2,200 short tons per day, an average of 3.42% copper equivalent, and a total mining inventory of 5.75 million short tons; Crean Hill construction is anticipated to commence in 2027, based on 11.4 million short tons of probable reserves, an average payable copper equivalent production rate of 35.5 million pounds over a 12-year commercial mine life, approximately 2,400 short tons per day, and a copper equivalent grade of 3.0%.
- Record McCreedy West Copper-Equivalent GradeMcCreedy West safely mined and shipped 75,272 short tons from the 700 Footwall Copper Zone in Q3 2026. The contained grade of 3.6% copper equivalent was a quarterly record under Magna's ownership and was in line with expectations for higher grades during the second half of 2026.
- Strong Nine-Month Cash GenerationMcCreedy West generated a Q3 cash margin of $4.9 million, or USD 0.94 per copper equivalent payable pound, and a cash margin of $19.7 million during the first nine months of 2026.
- Strategic Investment Strengthened LiquidityAlpayana became Magna Mining's largest shareholder through a $140 million strategic investment for a 19.9% equity interest. The investment involved 62,356,682 common shares issued at $2.25 per share and increased the company's cash balance to $168.4 million at September 30, 2026, from $40 million at June 30, 2026. Working capital ended the quarter at $161.9 million.
- Major Improvement in Safety PerformanceMagna operated safely across its operations and projects. The total recordable injury frequency rate for the first nine months of 2026 declined to 0.43 from 2.23 in the same period of 2025, representing an 81% reduction.
- Levack Restart ApprovedThe Levack preliminary economic assessment outlined average annual production of 36.8 million payable copper-equivalent pounds over a 7.3-year mine life. The plan is based on a total mining inventory of 5.75 million short tons, a mining rate of 2,200 short tons per day, and an average grade of 3.42% copper equivalent. The Board approved the restart of Levack Mine, with commercial production forecast for mid-2028.
- Levack Development and Hoist Recommissioning ProgressLevack crews completed development of the initial 2,950 Level exploration drift toward the R2 Footwall Zone, while rehabilitation continued along the 2,650 Level and work progressed on the production hoist plant. The production hoist recommissioning project remains on track for completion in Q1 2027 and is expected to support underground development and pre-commercial ore production during 2027.
- Crean Hill Construction ApprovedThe Crean Hill pre-feasibility study identified 11.4 million short tons of probable reserves, with an average payable copper-equivalent production rate of 35.5 million pounds over a 12-year commercial mine life. The study is based on approximately 2,400 short tons per day at a 3.0% copper-equivalent grade. The Board approved construction of the Crean Hill Project, anticipated to commence in 2027.
- Progress Toward a Multi-Mine CompanyMagna plans to combine Levack and McCreedy West into the Levack Mine Complex to share technical, maintenance, operational, surface supervision, and ore-handling resources. Management stated that the low CapEx intensity production from Levack and Crean Hill will build on McCreedy West as Magna transitions to a multi-mine company.
- High-Grade Levack Exploration InterceptsDefinition drilling in the R2 Footwall Zone intersected massive sulfide veins, including 25.8% copper, 3.6% nickel, 8.9 grams per tonne platinum, 4.1 grams per tonne palladium, and 0.3 grams per tonne gold over 0.7 meters. Another 2.2-meter interval graded 9.7% copper, 0.6% nickel, 5.9 grams per tonne platinum, 10.2 grams per tonne palladium, 3.2 grams per tonne gold, and 59.2 grams per tonne silver.
- Additional Mineralization Identified at LevackUnderground development encountered sulfide mineralization over an approximately 12-meter section of the ramp near the Intermediate Orebody. A grab sample returned 5.7% copper, 8.4 grams per tonne platinum, 1 gram per tonne palladium, and 0.3 grams per tonne gold. Underground drilling is underway to test its extent, continuity, and relationship with the Intermediate Zone.
- Exploration Activity Expanded Across the PortfolioThree underground drill rigs were active at Levack during Q3, focused on the R2 Footwall Zone, Intermediate Zone, and new exploration targets. At Crean Hill, a surface exploration diamond drill rig was mobilized and began testing new footwall copper and precious-metal targets, representing the first exploration drilling at Crean Hill since 2024.
- Significant Q3 Drilling ProgramMagna completed 74 diamond drill holes totaling approximately 24,347 feet during Q3. At McCreedy West, three underground diamond drills continued definition drilling in the 700 Footwall Copper Zone to support stope design, grade optimization, and near- and mid-term production plans.
- McCreedy West Development ContinuedFinal surveyed underground development at McCreedy West totaled 1,934 feet during Q3, averaging 21 feet per day. Management stated that increased development during 2026 is expected to help diversify the 2027 mining plan.
- Potential for Improved 2027 McCreedy West GradesManagement stated that the west side of the 700 Footwall Zone is being developed based on encouraging 2026 drilling results. The area consists of fresh ground without mined-out areas on multiple sides, and management expects 2027 grades to be very similar to the original 2026 guidance.
- Positive Outlook for Levack ExplorationManagement described the exploration results from Levack as encouraging and stated that the company is on the path to another footwall copper and precious-metals discovery. The R2 Footwall Zone remains open up dip, toward the #3 Footwall Zone, and at depth to the south.
DE:8YD Earnings History
| Report Date | Fiscal Quarter | Forecast / EPS | Last Year's EPS | EPS YoY Change | Press Release |
|---|---|---|---|---|---|
| Apr 26, 2027 | 2026 (Q4) | ―- | -0.02 | ― | ― |
| Nov 11, 2026 | 2026 (Q3) | -0.00-0.03 | -0.03 | 0.00% (+0.00) | |
| Aug 12, 2026 | 2026 (Q2) | 0.01-0.02 | -0.03 | 25.00% (+0.01) | |
| May 27, 2026 | 2026 (Q1) | ―-0.02 | -0.02 | 0.00% (+0.00) | |
| Apr 20, 2026 | 2025 (Q4) | 0.01- | -0.02 | ― | |
| Nov 25, 2025 | 2025 (Q3) | -0.03-0.03 | -0.02 | -66.67% (-0.01) | |
| Nov 25, 2025 | 2025 (Q4) | 0.01-0.02 | -0.02 | 0.00% (+0.00) | |
| Aug 27, 2025 | 2025 (Q2) | ―-0.03 | 0.01 | -300.00% (-0.04) | |
| May 29, 2025 | 2025 (Q1) | ―0.10 | 0.01 | 689.47% (+0.08) | |
| Apr 09, 2025 | 2024 (Q4) | ―-0.02 | 0.01 | -257.89% (-0.03) |
The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.