TipRanks
Go Ultimate55% OFF

Torex Gold Resources (73GN) Q2 2026 Earnings Report

DE:73GN Q2 2026 EPS Results

Actual EPS
EUR 0.80
Consensus EPS
EUR 0.89
Beat/Miss
Missed by -EUR 0.09
One Year Ago EPS
EUR 0.45

DE:73GN Q2 2026 Revenue Results

Actual Revenue
EUR 359.72M
Expected Revenue
EUR 371.24M
Beat/Miss
Missed by -EUR 11.52M
YoY Revenue Growth
+60.22%

Earnings Announcement Details

Quarter
Q2 2026
Date
08/06/2026
Time
After Close
Conference Call
Thursday, August 6, 2026
DE:73GN Upcoming Earnings

Torex Gold Resources's next earnings date is estimated for November 4, 2026, based on past reporting schedules.

Q2 2026 Earnings Call Audio

DE:73GN Q2 2026 Earnings Call
0:00 / 0:00

Q2 2026 Earnings Slide Deck

Q2 2026 Earnings Call Summary

Q2 2026
Earnings Call Date:Aug 06, 2026|% Change Since:14.96%|
Earnings Call Sentiment|Positive

The call presented a largely positive operational and financial picture: production remains on plan, throughput and mining rates are outperforming, cash flow and liquidity are strong, projects (Media Luna North, Los Reyes) and exploration are progressing, and capital returns are substantial. However, material cost headwinds (elevated AISC driven by higher reagent consumption and prices, a stronger Mexican peso, and below-target gold recoveries), higher sustaining capex, and provisional pricing noise are notable challenges. Management has outlined clear mitigation strategies and expects improving recoveries and production in H2 to materially improve costs and cash flow.

Company Guidance

Management left full‑year production guidance unchanged at 420,000–470,000 ounces (Q2 produced just over 96,000 oz and YTD ~197,000 oz; July >43,000 oz and Q3 guide ~115,000 oz), but revised AISC to $2,000–$2,100/oz (Q2 AISC $2,459/oz; YTD AISC $2,165/oz) on updated metal assumptions of $4,500/oz gold (previously $4,000), $72.50/oz silver and $6/lb copper; sustaining capital is now $135–$145M and exploration budget was increased to $85M (from $77M) with 20,000 m planned at Los Reyes and >13,000 m added near Media Luna, while mining and processing rates remain strong (Media Luna ~7,700 tpd, ELG ~3,100 tpd, plant throughput ~10,800 tpd), targeted gold recovery 90% (July ~88%), cyanide consumption ~6.5 kg/t (vs prior budgeted 2.5–3 kg/t), Q2 free cash flow $94M (after $39M Mexican profit‑sharing), margin 46%, cash $169M (from $130M) with >$500M liquidity, no debt and credit facility extended to June 2030 (with $200M accordion), capital returns $55M in Q2 (YTD $176M toward a $350M target), expected income tax installments ~ $55M/quarter in H2, Media Luna North still on track for first production by end‑2026, and Los Reyes PFS expected late‑2027.

  • Production on Track and H2 UpsideQ2 production of just over 96,000 oz (gold equivalent) and year-to-date ~197,000 oz; management expects Q2 was the lowest quarter and forecasted full-year production guidance unchanged at 420,000–470,000 oz with a step-up in H2 (July produced >43,000 oz and Q3 modeled ~115,000 oz).
  • Strong Free Cash Flow and Capital ReturnsGenerated $94 million of free cash flow in Q2 (net of $39M Mexican profit sharing). Returned $55 million to shareholders in Q2 (11M dividends, 44M buybacks); YTD capital returned $176M (≈50% of the $350M full-year target).
  • Healthy Margins and LiquidityAll-in sustaining margin remained robust at 46%; exited the quarter with $169M cash (up from $130M, +~30%) and zero debt with total available liquidity >$500M. Undrawn credit facility extended to June 2030 with a $200M accordion.
  • Operational Outperformance and ThroughputMining rates above plan: Media Luna ~7,700 tpd, ELG ~3,100 tpd; processing throughput ahead of design at ~10,800 tpd and expected to be sustained for the rest of the year.
  • Project and Exploration ProgressMedia Luna North remains on schedule for first production by year-end with key breakthroughs (North vent adit and 1 km haulage drift). Los Reyes PEA completed and PFS targeted late 2027; drilling ramped (20,000 m planned at Los Reyes) and overall exploration budget increased from $77M to $85M (+~10%).
  • Safety PerformanceDelivered a safe quarter with no lost-time injuries for the fifth consecutive quarter; 0 lost-time injury frequency rate per million hours for employees and contractors.
  • Recoveries ImprovingCopper and silver recoveries saw meaningful improvements in Q2; gold recovery improved quarter-over-quarter and July average recovery was ~88% with expectations to approach the ~90% target through H2.
  • Cost Management Actions PlannedManagement outlined actionable steps to reduce reagent (cyanide) consumption including lead nitrate addition, an extra MACH Reactor, and a new GM model; targeted to reduce consumption towards 2027 normalized levels.

DE:73GN Earnings History

DE:73GN earnings history
Report DateFiscal QuarterForecast / EPSLast Year's EPSEPS YoY ChangePress Release
Nov 04, 20262026 (Q3)1.31-1.06――
Aug 06, 20262026 (Q2)0.890.800.4580.00% (+0.36)
May 06, 20262026 (Q1)1.421.860.37407.32% (+1.49)
Feb 18, 20262025 (Q4)1.291.570.72117.28% (+0.85)
Nov 05, 20252025 (Q3)1.001.060.6758.67% (+0.39)
Aug 06, 20252025 (Q2)0.380.450.54-16.67% (-0.09)
May 07, 20252025 (Q1)0.210.370.37-2.38% (-0.01)
Feb 19, 20252024 (Q4)0.490.720.5142.11% (+0.21)
Nov 06, 20242024 (Q3)0.540.670.12476.92% (+0.55)
Aug 07, 20242024 (Q2)0.420.540.3936.36% (+0.14)

The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.

Beat Missed
Show More