Metro Mining Limited earnings date
Metro Mining Limited (6ME) Q2 2026 Earnings Report
DE:6ME Q2 2026 EPS Results
- Actual EPS
- -EUR 0.04
- Consensus EPS
- ―
- Beat/Miss
- ―
- One Year Ago EPS
- EUR 0.25
DE:6ME Q2 2026 Revenue Results
- Actual Revenue
- EUR 61.06M
- Expected Revenue
- ―
- Beat/Miss
- ―
- YoY Revenue Growth
- -31.93%
Earnings Announcement Details
- Quarter
- Q2 2026
- Date
- 08/28/2026
- Time
- Before Open
- Conference Call
- Friday, August 28, 2026
Metro Mining Limited's next earnings date is estimated for March 4, 2027, based on past reporting schedules.
Q2 2026 Earnings Call Audio
No earnings call audio is available for this earnings event.
Q2 2026 Earnings Slide Deck
No slide deck is available for this earnings event.
Q2 2026 Earnings Call Summary
The call was predominantly positive. Management highlighted record quarterly tonnage, improved operating consistency, stronger waste-clearing performance, customer additions, expanded stockpile capacity, a strengthened balance sheet, maintained 6.6 million to 7.1 million-ton guidance, and improved pricing for the current quarter. These positives were tempered by weaker quarter-two pricing, higher diesel and freight costs, a missed quarterly EBITDA target, maintenance-related disruption to Ikamba, market oversupply and Guinea uncertainty, and a serious but non-fatal safety incident.
Metro Mining is still targeting that 6.6 million-7.1 million sort of guidance, with 7 million the big nameplate number, and is aiming for roughly around a double-digit margin and about a AUD 9-AUD 10 EBITDA margin; the second half is where it expects to go hard, with a 5 million ton run rate, $30 delivered into the market, and more like 700 tons, 800 tons a month up to that sort of 900 tons per month type run rate, while freight cover is roughly 80%-90% for the rest of this year at sub $10 freight rates, and the company expects to be close to cash neutral, to be net cash, with share-buyback activity in the very near future and a dividend policy of distributing at least 20% of cash flow after the debt servicing, et cetera, subject to any other kind of call on the cash.
- Record Quarterly Tonnage and Improved Operational ResilienceMetro Mining delivered a record quarter from a tonnage perspective despite a large cyclone and significant waves affecting the shipping channel. The company returned online in April, restarted barging in the first week of April, and said its response demonstrated increased resilience to external weather events.
- Integrated Operating System Improved ConsistencyThe company reported proof of concept for its revised management operating system, particularly during the first three weeks of June, which were described as the three highest-capacity and least-variable weeks with the supply chain working extremely well.
- Record Year-on-Year Q2 Operational ResultsManagement described Q2 results as records versus the prior year despite the tropical cyclone, river-depth impacts, geared-vessel complexity while Ikamba was away, and increased freight and diesel costs.
- Waste Clearing and Stripping Ahead of ExpectationsWaste movement was 70% higher than planned. Management said this addresses the constraint experienced in the second half of last year and positions the company well for the second half, although it had some cost impact during the quarter.
- Improved Grade Control and Ore QualityIntegrated planning and grade control materially improved the consistency of ore quality delivered to barges and customers. The company said blending across two or three pits and achieving the right grades on shipments had gone extremely well.
- Customer Diversification ProgressMetro added two new customers that took trial cargoes during the quarter and into the following quarter. Management said the company has served 15 to 20 refineries directly over the last six or seven years and is working with four or five new Chinese refineries that have either commissioned or are expected to commission this year.
- Expanded Port Stockpile CapacityAfter securing approvals, Metro extended its port stockpile capacity to potentially hold almost 400,000 tons. Management said this is part of its Q1 resilience and cash-neutrality drive and can allow vessel loading to continue even if mine pits become waterlogged during the wet season.
- Strengthened Balance SheetMetro ended the quarter with AUD 24 million of cash, while secured debt was reduced to just over AUD 30 million. Management said the balance sheet places the company in good shape and that it expects to be close to cash neutral or net cash under its strategy.
- Second-Half Production Guidance MaintainedManagement reaffirmed guidance of 6.6 million to 7.1 million tons and said the second half is the most important part of the year, when economies of scale are expected to come through, costs come down, and tons increase. The company is still targeting the 7 million-ton nameplate level.
- Ikamba Returned to OperationAfter statutory five-year dry docking, maintenance, recommissioning work, and replacement of all four hydraulic cylinders on one crane, Ikamba returned to operation during the week of the call.
- Dry Screening Could Expand Resource and Reserve BaseDry screening test work produced sellable product from material with up to 19% silica at approximately 60% to 65% yield, while lower-silica material achieved yields of up to 80%. Management said this could support evaluation of converting resources into reserves, with potential announcements subject to competent-person sign-off toward the end of the year.
- Potential Longer-Term Silica and Kaolin OpportunitiesMetro is evaluating kaolin beneath its bauxite and silica deposits, including potential applications in the glass market and solar-panel glass. Management described these as longer-term opportunities and said the company is investigating its leases and extraction capabilities.
- Aluminum Market Demand Remains StrongManagement said aluminum demand remains strong, supported by electrification and vehicle lightweighting, with demand growth of 3% and up to 4%. The company also said China is not expected to add significant aluminum production capacity and that the incentive price for new smelters has increased.
- Alumina Pricing RecoveredAfter reaching a bottom around January, February, and March, alumina pricing recovered by approximately AUD 30 to AUD 40 per ton equivalent to around RMB 200 per ton equivalent or slightly more. Management attributed the recovery partly to capacity rationalization in China and continued aluminum demand.
- Higher Bauxite Pricing Secured for the Current QuarterMetro negotiated bauxite prices for the current quarter approximately $4 per ton higher on average on a CIF basis, representing about a 9% increase from the prior level. Management said this increase should flow toward the bottom line, subject to demurrage, freight, and other issues.
- Freight Coverage Provides ProtectionMetro has approximately 80% to 90% of its freight requirements covered for the rest of the year, along with a decent amount of coverage for the following two years. Management said contracted freight rates protected the company from entering loss-making territory during the prior quarter.
- Financial Assurance ReleaseThe company reported an AUD 9.6 million year-to-date release of amounts held for financial assurance and performance guarantees. Management said progressive rehabilitation plans improved the definition of rehabilitation liabilities and allowed the required surety to be reduced, with confidence that the cash can be returned to the balance sheet before year-end.
- Community and Environmental EngagementMetro hosted a naming ceremony for its Mandang tug with traditional owner groups, council members, and local traditional owners. The company also highlighted its educational programs through the Johnathan Thurston Academy and community involvement with MPA College and the Gold Coast Suns.
- Share Buyback Expected to Resume SoonManagement said the share buyback had been intentionally slower because of weather, Ikamba's recommissioning, the Gulf conflict, and higher diesel prices. With fuel security in place and Ikamba operating at nameplate capacity, the company expects buyback activity to begin in the very near future.
- Dividend Policy ReaffirmedMetro reiterated its policy of distributing at least 20% of cash flow after debt servicing, subject to other calls on cash. Management said dividends will be reviewed at year-end and are the preferred mechanism if the company's second-half performance supports them.
DE:6ME Earnings History
| Report Date | Fiscal Quarter | Forecast / EPS | Last Year's EPS | EPS YoY Change | Press Release |
|---|---|---|---|---|---|
| Mar 04, 2027 | 2026 (Q4) | ―- | 0.05 | ― | ― |
| Aug 28, 2026 | 2026 (Q2) | ―-0.04 | 0.25 | -116.02% (-0.30) | |
| Feb 26, 2026 | 2025 (Q4) | ―0.05 | 0.03 | 51.02% (+0.02) | |
| Aug 28, 2025 | 2025 (Q2) | ―0.25 | -0.08 | 432.26% (+0.33) | |
| Feb 27, 2025 | 2024 (Q4) | ―0.03 | 0.01 | 226.67% (+0.02) | |
| Aug 28, 2024 | 2024 (Q2) | ―-0.08 | -0.05 | -63.16% (-0.03) | |
| Feb 28, 2024 | 2023 (Q4) | ―0.01 | -0.09 | 110.79% (+0.10) | |
| Aug 31, 2023 | 2023 (Q2) | ―-0.05 | -0.12 | 61.22% (+0.07) | |
| Feb 28, 2023 | 2022 (Q4) | ―-0.09 | -0.08 | -13.01% (-0.01) | |
| Aug 31, 2022 | 2022 (Q3) | ―-0.12 | -0.78 | 84.37% (+0.65) |
The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.