- Regulation - Risk 1In Beginning in 2024 through at least 2027, electric distribution rates for Ameren Illinois are established through an MYRP, which are subject to ongoing regulatory and judicial proceedings and associated risks, and are subject to a reconciliation cap. Additionally, Ameren Illinois is subject to certain performance metrics that if not achieved would result in a reduction to the company's allowed ROE.
Pursuant to the CEJA, Ameren Illinois has the option to establish electric distribution rates through an MYRP or a traditional regulatory rate review. An MYRP establishes rates for a four-year period, and Ameren Illinois has the option to file for an MYRP every four years. Ameren Illinois elected to file an MYRP for rates effective in 2024 through 2027. Under the MYRP, Ameren Illinois is allowed to reconcile its actual electric distribution revenue requirement, as adjusted for certain cost variations, to the ICC-approved revenue requirement on an annual basis, subject to a reconciliation cap. The reconciliation cap limits the annual adjustment to 105% of the annual revenue requirement approved by the ICC. Certain variations from forecasted costs are excluded from the reconciliation cap, including those associated with major storms; new business and facility relocations; changes in the timing of certain expenditures or investments into or out of the applicable calendar year; and changes in interest rates, income taxes, taxes other than income taxes, pension and other post-retirement benefits costs, and amortization of certain assets. The reconciliation cap also excludes costs recovered outside of base rates through riders. The actual revenue requirement for a particular year incorporates Ameren Illinois' year-end rate base and actual capital structure for such year, provided that the resulting revenue requirement does not exceed the 105% reconciliation cap and the common equity ratio in such capital structure may not exceed that approved by the ICC in the MYRP. Ameren Illinois' existing riders continue to be effective under the MYRP. In addition, the ICC determines the ROE applicable to each year of the four-year period. Economic conditions could result in the annual predetermined ROE becoming inadequate over the four-year period. Ameren Illinois has filed an appeal of the ICC-determined ROE for 2024 through 2027 to the Illinois Appellate Court for the Fifth Judicial District. For additional information on the appeal see Note 2 – Rate and Regulatory Matters under Part II, Item 8, of this report. Failure to limit capital expenditures and operation and maintenance expenses to amounts that maintain revenue requirements under the reconciliation cap limit would adversely affect Ameren's and Ameren Illinois' results of operations, financial position, and liquidity.
- Environmental / Social - Risk 2We are subject to business and financial risks related to the impact of climate change climate-related legislation, regulation, and emission reduction initiatives.
There is concern and activism among various external stakeholders, both nationally and internationally, about climate-related risks, including public concerns about the potential environmental impacts from the combustion of fossil fuels, as well as pressure from public interest groups regarding limiting the use of natural gas. Also, state and local authorities have proposed restrictions on the use of natural gas, and the ICC is conducting a future of gas proceeding to explore issues involved with decarbonization of the natural gas distribution system in the state of Illinois. Further, federal, state, and local authorities have considered initiatives to further restrict greenhouse gases to address global climate-related risks. Additionally, international agreements have in the past, and could again, lead to future federal or state legislation or regulations. In 2015, the United Nations Framework Convention on Climate Change reached consensus among approximately 190 nations on an agreement, known as the Paris Agreement, that establishes a framework for greenhouse gas mitigation actions by all countries, with a goal of holding the increase in global average temperature to below 2 degrees Celsius above pre-industrial levels and an aspiration to limit the increase to 1.5 degrees Celsius. The United States withdrew from the Paris Agreement and the United Nations Framework Convention on Climate Change in January 2025 and 2026, respectively. The EPA has revised, and has proposed revisions to, compliance requirements under a number of federal environmental regulatory programs related to greenhouse gases; however, differences in energy policy priorities adopted by future presidential administrations could result in additional greenhouse gas reduction requirements in the United States. As a result of our diverse fuel portfolio, our emissions of greenhouse gases vary among our energy centers, but coal-fired power plants are significant sources of CO2 emissions. Future federal and state legislation or regulations that mandate limits on the emission of, or impose taxation on, greenhouse gases could result in a significant increase in capital expenditures and operating costs, decreased revenues, penalties or fines, or reduced operations of some of Ameren Missouri's coal- and natural gas-fired energy centers, which, in turn, could lead to increased liquidity and financing needs, and higher financing costs. Moreover, to the extent Ameren Missouri requests recovery of these costs through rates, its regulators might deny some or all of, or defer timely recovery of, these costs. Excessive costs to comply with future legislation or regulations related to climate-related risks might force Ameren Missouri to close its remaining coal-fired energy centers earlier than planned, which could lead to possible loss on abandonment and reduced revenues. As a result, mandatory limits could have a material adverse impact on Ameren's and Ameren Missouri's results of operations, financial position, and liquidity. Ameren is targeting net-zero carbon emissions by 2045, as well as a 60% reduction by 2030 and an 85% reduction by 2040 based on 2005 levels in a safe, reliable, and affordable manner. Ameren's goals include both reduction of direct emissions from operations (scope 1), as well as electricity usage at Ameren buildings (scope 2), including other greenhouse gas emissions of methane, nitrous oxide, and sulfur hexafluoride. Achievement of these targets is dependent on many factors, including the pace and extent of development and deployment of low- to zero-carbon energy technologies and carbon capture technologies, the cost of those technologies, and support of such technologies by regulators; natural gas and energy prices; operational performance of low- to zero-carbon resources; new transmission infrastructure; the ability to maintain system reliability; customer demand for energy including carbon-free energy; and constructive energy and economic policies, including those that address investment in energy infrastructure, global climate-related risks, incentives for clean energy technologies, and environmental regulations. Additional factors associated with operational risks for the construction and acquisition of electric and natural gas infrastructure may also affect the achievement of these goals, as further discussed below. The strategy to achieve these goals also relies on continuing to pursue a diverse portfolio, including low-carbon and carbon-free resources and energy-efficiency resources, while still meeting load growth opportunities; continuing to participate in efforts to help advance the development of technologies such as carbon capture and sequestration; the use of hydrogen fuel for electric production and energy storage, next generation nuclear, and large-scale long-cycle battery storage; and constructively engaging with legislators, regulators, investors, customers, and other stakeholders to support outcomes leading to a net-zero future.
Risk Highlights Q2, 2026
Risk Word Cloud
Risk Factors Full Breakdown - Total Risks 20
- Manufacturing - Risk 1Our electric generation and electric and natural gas transmission and distribution facilities, including natural gas storage facilities, are subject to operational risks.
Our financial performance depends on the successful operation of electric generation and electric and natural gas transmission and distribution facilities, including natural gas storage facilities. Operation of these facilities involves many risks, including: - facility shutdowns due to operator error, or a failure of equipment or processes;- longer-than-anticipated maintenance outages;- failures of equipment that can result in unanticipated liabilities or unplanned outages;- aging infrastructure that may require significant expenditures to operate and maintain;- natural gas leaks or explosions near populated areas, including residential areas, business centers, industrial sites, and other public gathering places;- lack of adequate water required for cooling plant operations and to operate hydroelectric energy centers;- labor disputes;- disruptions in the delivery of electricity and natural gas to our customers;- inability to maintain reliability of our electric utility services as coal-fired energy centers are retired and renewable energy generation is placed in service, as well as our ability to meet generation capacity obligations, which could potentially increase if new data centers and/or other large primary service customers locate within our service territories;- disruptions to the global supply chain as a result of shortages for labor, materials, or equipment, tariffs and international trade relations, geopolitical conflict, delivery delays, and economic pressures, among other things;- suppliers and contractors who do not perform as required under their contracts, including those obligations that are affected by supply chain disruptions;- failure of other operators' facilities and the effect of that failure on our electric and natural gas systems and customers;- inability to comply with regulatory requirements or obtain permits, including those relating to environmental laws;- handling, storage, and disposition of CCR;- unusual or adverse weather conditions or other natural disasters, including but not limited to those that may result from climate-related risks, such as severe storms, droughts, wildfires, floods, tornadoes, earthquakes, icing, sustained high or low temperatures, solar flares, and electromagnetic pulses;- the level of wind and solar resources;- inability to operate wind generation facilities at full capacity resulting from requirements to protect natural resources, including wildlife, or other conditions limiting full capacity;- the occurrence of catastrophic events such as fires, explosions, acts of sabotage, which in recent years have increased in frequency and severity within the utility industry, acts of terrorism, civil unrest, pandemic health events, or other similar events;- accidents that might result in injury or loss of life, extensive property damage, or environmental damage;- ineffective vegetation management programs;- cybersecurity risks, including loss of operational control of Ameren Missouri's energy centers and our transmission and distribution systems and loss of data, including sensitive customer, employee, financial, and operating system information, through insider or outsider actions;- limitations on amounts of insurance available to cover losses that might arise in connection with operating our electric generation facilities, electric and natural gas transmission and distribution facilities, and natural gas storage facilities;- inability to implement or maintain information systems;- failure to keep pace with and the ability to adapt to rapid technological change, including generative and agentic artificial intelligence; and - other unanticipated operations and maintenance expenses and liabilities. The foregoing risks could affect the operations of our facilities, impede our ability to meet regulatory requirements, or expose us to an increase in litigation, which could increase operating costs, increase our capital requirements and costs, reduce our revenues, or have an adverse effect on our liquidity.
- Manufacturing - Risk 2Ameren Missouri's ownership and operation of a nuclear energy center creates business, financial, and waste disposal risks.
Ameren Missouri's ownership of the Callaway Energy Center subjects it to risks associated with nuclear generation, including: - potential harmful effects on the environment and human health resulting from radiological releases associated with the operation of nuclear facilities and the storage, handling, and disposal of radioactive materials;- continued uncertainty regarding the federal government's plan to permanently store spent nuclear fuel and, as a result, the need to provide for long-term storage of spent nuclear fuel at the Callaway Energy Center;- limitations on the amounts and types of insurance available to cover losses that might arise in connection with the Callaway Energy Center or other United States nuclear facilities;- uncertainties about contingencies and retrospective insurance premium assessments relating to claims at the Callaway Energy Center or other United States nuclear facilities;- public and governmental concerns about the safety and adequacy of security at nuclear facilities;- limited availability of fuel supply and our reliance on licensed fuel assemblies from primarily one NRC-licensed supplier of Callaway Energy Center's assemblies;- costly and extended outages for scheduled or unscheduled maintenance and refueling;- increased regulatory scrutiny and oversight resulting from more frequent outages;- uncertainties about the technological and financial aspects of decommissioning nuclear facilities at the end of their licensed lives;- the ability to continue to attract and retain qualified labor to operate the Callaway Energy Center;- the adverse effect of poor market performance and other economic factors on the asset values of nuclear decommissioning trust funds and the corresponding increase, upon MoPSC approval, in customer rates to fund the estimated decommissioning costs; and - potential adverse effects of a natural disaster, acts of sabotage or terrorism, including a cyber attack, or any accident leading to a radiological release. The NRC has broad authority under federal law to impose licensing and safety requirements for nuclear facilities. In the event of noncompliance, the NRC has the authority to impose fines or to shut down a unit, or both, depending upon its assessment of the severity of the situation, until compliance is achieved. Revised safety requirements promulgated from time to time by the NRC could necessitate substantial capital expenditures at the Callaway Energy Center. In addition, if a serious nuclear incident were to occur and result in serious injury, loss of human life, significant damage to property, environmental impacts, and impairment of our operations, it would adversely affect Ameren's and Ameren Missouri's results of operations, financial condition, and liquidity. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation of any domestic nuclear unit and could also cause the NRC to impose additional conditions or requirements on the industry, which could increase costs and result in additional capital expenditures. While the Callaway Energy Center is in compliance with the current NRC standards relating to seismic design and risk, these standards also require Ameren Missouri to address periodic changes to seismic hazard data and evaluation methods for the impact of an earthquake on its Callaway Energy Center due to its proximity to a fault line, which could require seismic risk evaluation updates and installation of additional capital equipment.
See a full breakdown of risk according to category and subcategory. The list starts with the category with the most risk. Click on subcategories to read relevant extracts from the most recent report.