Mine Life ExpectancyThe updated life-of-mine plan extends operations to 2028, which is shorter than the previously assumed total mine life extending to 2033, resulting in a lowered target price.
Operational PlansThe updated life-of-mine plan no longer includes the construction of a heap leach facility, leading to the removal of production from stockpiles from the assumptions.
Reserve QualityContained gold in reserves is 14% higher than the 2,061koz previously reported, while the average grade is 17% lower vs. 1.20 g/t previously.