Torex Gold Resources (TXRN) Q3 2026 Earnings Report

0 Followers

MX:TXRN Q3 2026 EPS Results

Actual EPS
MXN 35.90
Consensus EPS
MXN 27.96
Beat/Miss
Beat by +MXN 7.94
One Year Ago EPS
MXN 22.13

MX:TXRN Q3 2026 Revenue Results

Actual Revenue
MXN 10.18B
Expected Revenue
MXN 10.09B
Beat/Miss
Beat by +MXN 88.77M
YoY Revenue Growth
+35.49%

Earnings Announcement Details

Quarter
Q3 2026
Date
11/04/2026
Time
After Close
Conference Call
Wednesday, November 4, 2026
MX:TXRN Upcoming Earnings

Torex Gold Resources's next earnings date is estimated for February 24, 2027, based on past reporting schedules.

Q3 2026 Earnings Call Audio

MX:TXRN Q3 2026 Earnings Call
0:00 / 0:00

Q3 2026 Earnings Slide Deck

Q3 2026 Earnings Call Summary

Q3 2026
Earnings Call Date:Nov 04, 2026|% Change Since:-29.16%|
Earnings Call Sentiment|Positive

The call was strongly positive, led by a 37% quarter-over-quarter production increase, a 27% reduction in all-in sustaining costs, robust EBITDA and free cash flow growth, strong liquidity and progress toward multiple organic growth opportunities. The main cautions were persistent consumable and currency cost pressures, higher expected sustaining capital in 2027, temporary Q4 cash-flow timing effects and the execution and resource dependencies associated with future plant expansion.

Company Guidance

Torex remains on track for annual production guidance of 420,000 to 470,000 ounces and full-year all-in sustaining costs of $2,000 to $2,100 per ounce, with full-year capital expenditures of $300 million to $320 million; 2027 production is expected to average in the 110,000 to 115,000 ounce range per quarter, based on about 4 grams a tonne gold equivalent and current plant throughput levels, with Media Luna expected to maintain 8,000 tonnes per day. Media Luna North remains on track for first ore late this year, with approximately 1,000 tonnes per day on average in 2027, the current plan to end the year at close to 1,400 tonnes per day, and further ramp-up towards the 2,300 tonne per day design capacity in subsequent years. Debottlenecking is expected to increase plant capacity to approximately 12,000 tonnes per day, begin in Q1 of 2027, be complete by the end of 2027, and provide the full year benefit through the course of 2028, while the larger expansion would increase capacity to 14,500 tonnes per day at about $100 million, with a Q1 of 2028 decision; the projects represent approximately 50,000 of additional ounces annually and a further approximate 100,000 ounces a year. Cyanide consumption is expected to remain at current levels through next year, all-in sustaining costs in '27 are expected to be relatively consistent with the level guided in 2026, Los Reyes’ pre-feasibility study is targeted for delivery in late 2027, and first production is targeted in 2031.

  • Strong Q3 Production and Cost ImprovementQ3 production increased approximately 37% quarter-over-quarter to 132,000 ounces, while all-in sustaining costs declined 27% quarter-over-quarter to $1,803 per ounce. The company generated $150 million of free cash flow and returned $95 million to shareholders while increasing its cash balance to $226 million.
  • Production Guidance Remains on TrackTorex remains on track to achieve its full-year production guidance of 420,000 to 470,000 ounces. Through the first nine months, production was approximately 329,000 ounces, representing 74% of the midpoint of full-year guidance. Year-to-date all-in sustaining costs were $2,025 per ounce, within the full-year guided range of $2,000 to $2,100 per ounce.
  • Mining Rates Above TargetBoth mines performed above target rates in Q3. Media Luna averaged approximately 8,200 tonnes per day, about 10% above design, while ELG Underground sustained more than 3,000 tonnes per day versus its 2,800-tonne target.
  • Higher Grades Supported ProductionAcross the Morelos complex, average mine grade increased to approximately 4.6 grams per tonne gold equivalent from 3.7 grams per tonne in Q2, driven by planned sequencing into higher-grade stopes.
  • Improved Processing Grades and RecoveriesQuarterly throughput was steady at 10,800 tonnes per day. Average processed grade increased to approximately 4.6 grams per tonne gold equivalent from 3.5 grams per tonne in Q2, while gold recovery improved by about 2.8 percentage points to 88%. Copper recovery remained strong at approximately 95%, and gold recovery continued to improve toward the 89% technical report benchmark.
  • Improved Operational VisibilityInstallation of backup paste and slurry pumps is expected to improve paste plant availability and support backfilling. The geomet model is providing better visibility into upcoming stope characteristics and ore response in the plant, supporting mine sequencing and recovery planning.
  • Media Luna North Progressing Toward First OreFirst ore from Media Luna North remains on track for late 2026. Ventilation, paste distribution and electrical infrastructure work advanced, initial production equipment arrived, and workforce hiring and training were underway. The mine is expected to average approximately 1,000 tonnes per day in 2027 and ramp toward its 2,300-tonne-per-day design capacity in subsequent years.
  • Los Reyes Development on ScheduleLos Reyes had six active drill rigs and close to 100 people on site, with nearly 6,000 meters of drilling completed during Q3. Drilling and field investigations remain focused on the resource model, geotechnical work and engineering inputs for a pre-feasibility study targeted for delivery in late 2027.
  • Low-Capital Plant Debottlenecking OpportunityStudies support increasing plant capacity to approximately 12,000 tonnes per day through debottlenecking existing infrastructure, with approximately $5 million of plant capital. Execution is expected to begin in Q1 2027, with completion by the end of 2027 and the full-year benefit expected in 2028.
  • Potential Larger Plant ExpansionA potential expansion involving additional flotation capacity and supporting equipment could increase total plant capacity to 14,500 tonnes per day, matching the installed grinding circuit capacity. The current capital estimate is approximately $100 million, with a decision targeted for Q1 2028.
  • Meaningful Processing and Production UpsideTogether, the debottlenecking and larger expansion opportunities represent potential processing-capacity growth of approximately 35%. Management estimates approximately 50,000 additional ounces annually from debottlenecking and a further approximately 100,000 ounces annually from the larger expansion, subject to achieved throughput, grade, recovery and feed availability.
  • San Miguel Exploration PotentialResults at San Miguel continue to support the potential for at least a 4-kilometer mineralized corridor extending westward from Media Luna toward Media Luna West. Management stated that the corridor has multimillion-ounce gold-equivalent potential, with indicative grades averaging higher than the Media Luna reserve grade. Drilling through 2027 is expected to support a maiden resource announcement targeted for Q1 2028.
  • Higher EBITDA and Free Cash FlowAdjusted EBITDA increased to $344 million from $204 million in Q2, while free cash flow increased to $150 million from $94 million. All-in sustaining margins increased to 58% from 46%, reflecting higher mined and processed grades and improved gold recovery.
  • Strong Liquidity and Capital ReturnsAt the end of September, cash was $226 million, above the $200 million minimum cash target. Available liquidity totaled $563 million, including $337 million available under the credit facility. Through September, the company returned $271 million of capital, or 77% of its $350 million 2026 target, including $239 million of share repurchases and $32 million of dividends.
  • Share Repurchase Program ProgressThe company repurchased approximately 4.9 million shares at an average price of just over CAD 67 per share, equivalent to approximately 5% of shares outstanding at the start of the year. Management said the buyback remained active after quarter-end and was well on track to meet its year-end target.
  • More Stable 2027 Production ProfileManagement expects 2027 production to be more stable than in 2026, with quarterly production in the range of 110,000 to 115,000 ounces based on current plant throughput and approximately 4 grams per tonne gold-equivalent feed grades. Media Luna production is expected to be modeled at approximately 8,000 tonnes per day.
  • Calm Security Conditions at Los ReyesAfter security challenges prevented the company from being on site in Sinaloa until May 2026, management stated that conditions in the area remained calm throughout Q3, with no challenges affecting delivery of plans and priorities.
  • Planned New York Stock Exchange ListingThe company is progressing a planned New York Stock Exchange listing to broaden investor access, subject to exchange approval and listing conditions.

MX:TXRN Earnings History

MX:TXRN earnings history
Report DateFiscal QuarterForecast / EPSLast Year's EPSEPS YoY ChangePress Release
Feb 24, 20272026 (Q4)26.23-32.74――
Nov 04, 20262026 (Q3)27.9635.9022.1362.18% (+13.76)
Aug 06, 20262026 (Q2)18.6216.749.380.00% (+7.44)
May 06, 20262026 (Q1)29.6138.697.63407.32% (+31.06)
Feb 18, 20262025 (Q4)26.8632.7415.07117.28% (+17.67)
Nov 05, 20252025 (Q3)20.7822.1313.9558.67% (+8.18)
Aug 06, 20252025 (Q2)7.949.3011.16-16.67% (-1.86)
May 07, 20252025 (Q1)4.357.637.81-2.38% (-0.19)
Feb 19, 20252024 (Q4)10.2315.0710.642.11% (+4.46)
Nov 06, 20242024 (Q3)11.2513.952.42476.92% (+11.53)

The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.

Beat Missed