Skip to main content
TipRanks
Go Ultimate75% OFF

Resolute Mining (RSM) Q4 2025 Earnings Report

2 Followers

DE:RSM Q4 2025 EPS Results

Actual EPS
EUR 0.02
Consensus EPS
―
Beat/Miss
―
One Year Ago EPS
-EUR 0.03

DE:RSM Q4 2025 Revenue Results

Actual Revenue
EUR 400.98M
Expected Revenue
―
Beat/Miss
―
YoY Revenue Growth
-8.21%

Earnings Announcement Details

Quarter
Q4 2025
Date
02/27/2026
Time
Before Open
Conference Call
Friday, February 27, 2026
DE:RSM Upcoming Earnings

Resolute Mining 's next earnings date is estimated for February 19, 2027, based on past reporting schedules.

Q4 2025 Earnings Call Audio

No earnings call audio is available for this earnings event.

Q4 2025 Earnings Slide Deck

No slide deck is available for this earnings event.

Q4 2025 Earnings Call Summary

Q4 2025
Earnings Call Date:Feb 27, 2026|% Change Since:-32.36%|
Earnings Call Sentiment|Positive

The call conveyed a predominantly positive operational and financial performance in 2025 — production met guidance, cash generation and the balance sheet materially strengthened, exploration delivered new resources, and the Doropo DFS shows transformative project economics. Key execution items (Doropo permitting and FID, SSCP commissioning) and large 2026 capital requirements introduce timing, permitting and funding risks, while elevated AISC guidance and stockpile-driven production declines (notably at Mako) temper the outlook. Overall the positives (stable operations, strong cash flow, attractive growth projects and exploration success) outweigh the headwinds, though near-term execution and country-level risks should be monitored closely.

Company Guidance

Resolute guided 2026 production of 250,000–275,000 oz of gold (Syama 195,000–210,000 oz; Mako 55,000–65,000 oz) with group AISC of $2,000–$2,200/oz (Syama $1,950–$2,150/oz; Mako $1,600–$1,800/oz); total 2026 CapEx of $310–$360M (Syama $110–$125M — including ~$40M to finish the SSCP, ~$40M waste stripping and ~$40M plant/equipment, Mako $15–$20M, and Doropo $170–$190M subject to permitting/FID with ~75% (~$135M) of Doropo spend in H2); exploration budget $15–$25M (primarily Côte d’Ivoire); Doropo DFS metrics include ~2.2M oz LOM production over 13 years, upfront capital ~$516M, LOM AISC $1,406/oz, post‑tax NPV5% $1.46B and IRR 49% at $3,000/oz; key timings include Syama SSCP Stage 1 commissioning in Q2 2026 (~110 t/h) and Stage 2 in Q3 2026 (~215 t/h), Syama H1/H2 production split 42%/58%, and Doropo construction start mid‑Q2 2026 with first gold H1 2028 if FID by end Q1; Mako guidance assumes processing ~2.2 Mt @ ~0.9 g/t with >90% recoveries; company expects to fund 2026 CapEx from existing liquidity (over ~$320M available) and a mix of cash and project financing.

  • Q4 and Full-Year Production in Line with GuidanceQ4 gold production of 66,000 oz (up 6,000 oz vs Q3); full-year 2025 production of 277,000 oz, within guidance range (275k–285k).
  • Strong Cash Generation and Improved Balance SheetGenerated ~$86M operating cash flow in Q4 (vs $70M in Q3, +22.9%); full-year operating cash flow $314M; year-end net cash $209M (≈$140M increase from start of year) and available liquidity >$320M.
  • Improved Profitability Metrics2025 EBITDA $383M, up from $319M in 2024 (+20.1%); revenue $863M from sale of 259k oz at an average realized price of $3,338/oz; company remains fully unhedged.
  • Lower Q4 All-In Sustaining Costs and Safety ImprovementGroup Q4 AISC $1,877/oz, down from ~ $2,200/oz in Q3 (≈14.7% reduction quarter-on-quarter); full-year AISC $1,843/oz in line with guidance. TRIFR reduced to 1.87x from 1.95x in prior quarter (≈4.1% improvement).
  • Doropo Project: Robust DFS and Material UpsideUpdated Doropo DFS: 55% increase in reserves vs prior DFS, life-of-mine production ~2.2M oz over 13 years, base-case post-tax NPV $1.46B at $3,000/oz (Gavin) and quoted NPV ≈$2.5B at $4,000/oz (CEO); AISC (DFS) $1,406/oz; IRR 49% and payback ~1.7 years (under 1 year at $4,000/oz). Front-end capital estimated at ~$516M; processing capacity +25% and strong average free cash flow (> $260M/year first 5 years).
  • Operational Stabilization and Project Execution at SyamaSyama Q4 production 47.2k oz and full-year 176.3k oz; underground set a monthly ore production record (>250,000 t); SSCP on time and on budget with Stage 1 commissioning targeted Q2 2026 and full commissioning in Q3 2026. SSCP expected to increase production by ~5–10% from 2026 levels.
  • Strong Performance and Life-Extension Work at MakoMako delivered 123k oz in 2025 at AISC $1,270/oz; Q4 production 18,755 oz with >91% recoveries and improved throughput (604 kt processed). Life-extension projects (Tomboronkoto resource 377k oz @1.7 g/t; Bantaco resources 266k oz @1.1 g/t) progressing with DFS/permits underway and MLEP CapEx guidance $10–15M for 2026.
  • Exploration Progress and New ResourcesExploration spend ~ $25M in 2025; Le Debo MRE of 643,000 oz @1.14 g/t; ABC projects include inferred ~2.2M oz @0.9 g/t on Kona permit with ongoing drill programs (targeting ≥20,000 m in 2026) and planned scoping studies (H1–H2 2026).

DE:RSM Earnings History

DE:RSM earnings history
Report DateFiscal QuarterForecast / EPSLast Year's EPSEPS YoY ChangePress Release
Feb 19, 20272026 (Q4)0.02-0.02――
Aug 19, 20262026 (Q2)0.060.050.03103.45% (+0.03)
Feb 27, 20262025 (Q4)―0.02-0.03157.14% (+0.05)
Aug 21, 20252025 (Q2)―0.030.01190.00% (+0.02)
Feb 27, 20252024 (Q4)―-0.020-483.33% (-0.02)
Aug 28, 20242024 (Q2)―0.010.04-76.74% (-0.03)
Feb 29, 20242023 (Q4)―-0.0000.00% (+0.00)
Aug 22, 20232023 (Q2)0.180.04-0.02315.00% (+0.06)
Feb 23, 20232022 (Q4)―-0.01-0.1396.00% (+0.13)
Aug 24, 20222022 (Q2)-0.01-0.02-0.1386.58% (+0.12)

The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.

Beat Missed