Skip to main content
TipRanks
Go Ultimate75% OFF

Westgold Resources (0W2) Q1 2027 Earnings Report

0 Followers

CH:0W2 Q1 2027 EPS Results

Actual EPS
―
Consensus EPS
―
Beat/Miss
―
One Year Ago EPS
CHF 0.03

CH:0W2 Q1 2027 Revenue Results

Actual Revenue
―
Expected Revenue
―
Beat/Miss
―
YoY Revenue Growth
―

Earnings Announcement Details

Quarter
Q1 2027
Date
11/13/2026
Time
TBA
Conference Call
Friday, November 13, 2026
CH:0W2 Upcoming Earnings

Westgold Resources's next earnings date is estimated for February 16, 2027, based on past reporting schedules.

Q1 2027 Earnings Call Audio

No earnings call audio is available for this earnings event.

Q1 2027 Earnings Slide Deck

No slide deck is available for this earnings event.

Q1 2027 Earnings Call Summary

Q1 2027
Earnings Call Date:Nov 13, 2026|% Change Since:―|
Earnings Call Sentiment|Positive

The call was strongly positive overall. Westgold reported production in line with FY2027 guidance, all-in sustaining costs below the guided range, record Beta Hunt mining rates, a 41% increase in reserves, strong cash generation, a debt-free and fully unhedged balance sheet, continued shareholder returns and a fully funded pathway toward approximately 0.5 million ounces of annual production by FY2029. The main challenges were Great Fingall's slower ramp-up and lower current grades, Bluebird's Q1 mining rate below target, weather-related exploration delays, higher costs from planned activity and open-pit stripping, and a significant tax payment due in Q2. Highlights significantly outweighed the lowlights.

Company Guidance

Westgold’s FY ’27 guidance is 385,000 to 425,000 ounces of production at an all-in sustaining cost of $2,980 to $3,380 per ounce, with non-sustaining capital of $450 million to $480 million and exploration of $50 million to $75 million; production is expected to reach between 425,000 and 470,000 ounces in FY ’28 and 460,000 to 510,000 ounces in FY ’29, with all-in sustaining costs falling at that point to between $2,640 and $3,000 per ounce, while installed processing capacity grows from 5.7 million tonnes a year to more than 7 million tonnes a year by FY ’29 and the plan targets around 0.5 million ounces a year by FY ’29, with Fletcher potentially adding around 140,000 ounces a year on top of production and providing a pathway beyond 600,000 ounces a year; Bluebird is expected to deliver plus 1 million tonnes for the full FY ’27, Beta Hunt is targeting a sustained 2 million tonne a year mining rate from Q2 this year, with gold production expected at around the 115,000 ounces as put in guidance, and Great Fingall is expected to reach commercial production in Q4.

  • Strong Safety PerformanceWestgold recorded no lost time injuries in Q1 FY2027, while its LTIFR reduced to 1.17. Key leading safety indicators also improved, supported by frontline engagement, critical control verification and leadership field presence.
  • Production In Line with FY2027 GuidanceQ1 production was 98,400 ounces, broadly in line with 98,900 ounces in Q4 and on pace for full-year guidance of 385,000 to 425,000 ounces. Westgold stated that it produced more than 400,000 ounces over the last four quarters, while also citing 402,000 ounces over the last four consecutive quarters.
  • Mining and Processing Volumes IncreasedOre mined increased 7% quarter-on-quarter to 1.42 million tonnes at 2.2 grams per tonne, driven by Great Fingall, Starlight, the Murchison Open Pit Program and Beta Hunt. Processing remained steady at 1.46 million tonnes at 2.3 grams per tonne, with mills fully utilized.
  • Ore Stockpiles Grew 51%Total ore stockpiles increased 51% to 696,000 tonnes, equivalent to roughly six weeks of mill feed. Murchison stockpiles rose 60% to 485,000 tonnes and Southern Goldfields stockpiles increased 34% to 211,000 tonnes. The stockpiles kept mills operating through wet weather and supported feed after planned maintenance.
  • All-In Sustaining Cost Below GuidanceQ1 all-in sustaining cost was $2,912 per ounce, below the FY2027 guided range of $2,980 to $3,380 per ounce, despite planned mill maintenance and higher waste stripping in open pits.
  • Strong Cash Generation and LiquidityWestgold sold just under 100,000 ounces at a realized gold price of $6,029 per ounce, generating $602 million in gold sales revenue. An all-in sustaining cost margin of $3,117 per ounce generated $292 million in mine operating cash flow, $157 million in net mine cash flow and a $251 million underlying treasury build. The company ended September with approximately $1.04 billion in cash, bullion and investments, remained debt-free and had around $1.6 billion of available liquidity, including an undrawn $600 million credit facility.
  • Fully Unhedged Balance SheetWestgold remained fully unhedged and debt-free, with more than $1 billion in cash, bullion and liquid investments at the end of September.
  • Ore Reserves Increased 41%Group ore reserves grew 41% to 4.1 million ounces. Management said 1.5 million ounces were added before depletion last year at a reserve conversion cost of $27 per ounce.
  • Fully Funded 4-5-6 Growth PlanWestgold outlined a fully funded pathway to around 0.5 million ounces of annual production by FY2029. The plan includes four operating hubs, 5.7 million tonnes per year of installed processing capacity growing to more than 7 million tonnes by FY2029, and production guidance of 425,000 to 470,000 ounces in FY2028 and 460,000 to 510,000 ounces in FY2029. FY2029 all-in sustaining costs are expected to be between $2,640 and $3,000 per ounce as higher grades and throughput come through.
  • Potential Fletcher ExpansionFletcher, which is outside the current three-year outlook, has a 1.1 million ounce maiden reserve and could add around 140,000 ounces per year, providing a stated pathway beyond 600,000 ounces of annual group production.
  • Beta Hunt Reached Record Mining RatesBeta Hunt achieved a record annualized mining rate of approximately 2 million tonnes in September, with interim primary ventilation commissioned ahead of target. The mine delivered a second consecutive quarterly record, mining 423,000 tonnes in Q1, and Westgold is targeting a sustained 2 million tonne annual rate from Q2.
  • Beta Hunt Infrastructure Investment ProgressWestgold has invested approximately $33 million over the last two years in Beta Hunt ventilation, dewatering, water supply, power, mine design and diamond drilling. Integrated Southern Goldfields expansion studies are underway, including options for a circa 4 million tonne mine and mill, while seven drill rigs continue to grow and define the ore body and Fletcher.
  • Regional Production ContributionsThe Murchison produced 71,900 ounces, with Meekatharra delivering 35,900 ounces at a 2.5 grams-per-tonne feed grade, Cue producing 19,000 ounces as more Great Fingall ore entered the blend, and Fortnum delivering around 17,000 ounces. Higginsville produced 26,500 ounces, up on Q4, including a scheduled Lakewood toll-treatment parcel.
  • Bluebird Development ProgressBluebird mining operated at an annualized 870,000 tonnes and achieved a quarterly mine grade of 3.1 grams per tonne as the schedule focused on smaller, higher-grade stopes. Additional mining areas are being opened, with management expecting to deliver more than 1 million tonnes for the full FY2027 and positioning Bluebird as key feed for the larger Meekatharra mill planned for FY2028.
  • Capital Investment and Growth FundingNon-sustaining capital was $111 million in Q1 against full-year guidance of $450 million to $480 million, supporting development at Bluebird, Great Fingall and Beta Hunt and investments in processing power, ventilation and camp infrastructure. Management stated that the 4-5-6 plan is funded from internal cash flow while shareholder returns continue.
  • Shareholder Returns IncreasedWestgold returned $122 million to shareholders in FY2026, comprising $27 million of buybacks and a $0.10 fully franked dividend totaling $95 million. For FY2027, the Board approved a $50 million on-market buyback, of which $22.3 million had already been completed at an average of $5.46 per share. The revised policy commits to a minimum return of $0.03 per share each year, including a minimum $0.02 dividend.
  • Continued Exploration InvestmentWestgold spent $24 million on exploration and resource development in Q1, with 25 rigs operating at quarter end. FY2027 exploration spending is planned at $50 million to $75 million, focused on reserve conversion, Bluebird, Cue, Paddy's Flat, Beta Hunt, Fletcher and greenfield targets at Higginsville.
  • Energy and Diesel ResilienceManagement said on-site diesel storage is sufficient to cover long periods of disruption. Three processing plants were converted to gas and solar hybrid power, leaving Higginsville as the only processing plant currently operating on diesel, consuming approximately 800,000 litres per month. Higginsville is expected to be converted to hybrid energy over the long term.
  • Multiple Processing Expansion OptionsWestgold is evaluating an expansion of Higginsville, a new mill closer to Beta Hunt, and the Spargos opportunity. Management stated that Spargos is approximately 30 kilometers from Beta Hunt compared with 90 kilometers to Higginsville, and that studies are underway with more information expected in early 2027.
  • Five Mines with More Than One Million Ounces ProducedManagement stated that Westgold has five mines that have each produced more than 1 million ounces, describing this as a rare combination within one company.

CH:0W2 Earnings History

CH:0W2 earnings history
Report DateFiscal QuarterForecast / EPSLast Year's EPSEPS YoY ChangePress Release
Feb 16, 20272027 (Q2)0.16-0.19――
Nov 13, 20262027 (Q1)―-0.03―
Aug 27, 20262026 (Q4)0.150.1008400.00% (+0.09)
May 18, 20262026 (Q3)―-0.05―
Feb 25, 20262026 (Q2)0.160.19-0.03738.46% (+0.22)
Nov 14, 20252026 (Q1)―-0.02―
Aug 28, 20252025 (Q4)0.060.000.06-98.17% (-0.06)
May 12, 20252025 (Q3)―0.050.0348.33% (+0.02)
Feb 13, 20252025 (Q2)―-0.030.05-155.91% (-0.08)
Nov 14, 20242025 (Q1)―0.020.03-37.78% (-0.01)

The table shows recent earnings report dates and whether the forecast was beat or missed. See the change in forecast and EPS from the previous year.

Beat Missed