tiprankstipranks
Smith-Midland begins production of precast utility manholes for Port of Virginia
The Fly

Smith-Midland begins production of precast utility manholes for Port of Virginia

Smith-Midland has begun production in their Virginia plant for $1.1M of precast concrete Utility Manholes for the North Norfolk International Terminal Optimization Project, in Norfolk, Virginia. The redevelopment project, consisting of over 74 acres of terminal property, will include multiple underground precast concrete utility boxes for electrical and communication uses. The utility manholes will also include cast iron frames and covers, all of which will be delivered to the site. Production and delivery of the boxes is set to last through 2024. Smith-Midland is designing and manufacturing multiple manholes utilizing ten different sizes with around 40 percent of the total order engineered to be rated for heavy-duty loads up to 100,000 lbs.

Published first on TheFly – the ultimate source for real-time, market-moving breaking financial news. Try Now>>

See the top stocks recommended by analysts >>

Read More on SMID:

Trending

Name
Price
Price Change
S&P 500
Dow Jones
Nasdaq 100
Bitcoin

Popular Articles