The latest announcement is out from Azarga Metals ( (TSE:AZR) ).
Azarga Metals completed its first drill program at the Marg Project, a copper-rich VMS deposit in Yukon’s Keno Hill district, drilling nearly 2,500 metres across six holes in the deposit’s central zone. The work tested down-plunge extensions of previously intersected sulphide mineralization, while the mineralized footprint remains open to the east, west and at depth.
Core processing and logging are complete, and 350 samples were sent to ALS for preparation before multi-element analysis. The project’s 2025 resource estimate, at a 0.5% CuEq cut-off, comprises 4.3 million tonnes indicated at 2.9% CuEq and 10.0 million tonnes inferred at 2.3% CuEq, with infrastructure including an airstrip, base camp and nearby power corridors.
More about Azarga Metals
Azarga Metals is a mineral exploration company advancing the Marg Project, a high-grade, copper-rich volcanogenic massive sulphide deposit in central Yukon. It owns 100% of 400 mineral claims covering approximately 8,400 hectares, with mineralization containing copper, lead, zinc, silver and gold.
Average Trading Volume: 15,127
Technical Sentiment Signal: Sell
Current Market Cap: C$10.51M
For detailed information about AZR stock, go to TipRanks’ Stock Analysis page.
Trending Articles:
This article was AI-generated from the company’s official filing, with automated quality checks and editorial spot-checks.

